Cost of Fill Dirt Per Yard 2026

Homeowners and builders typically pay for fill dirt by the cubic yard with costs driven by dirt type, delivery distance, and project size. This guide outlines the price range, common drivers, and ways to trim the bill. Understanding the cost components helps buyers estimate total project expenses with accuracy.

Item Low Average High Notes
Fill Dirt (Delivered) $12 $25 $45 Includes basic dirt; quality and moisture vary
Soil By Weight/Volume $0.50/gal $0.75/gal $1.50/gal Used for small fills or amendments
Labor & Dump Fees $0 $10/$yd $25/$yd Depends on place, loader work, and disposal
Delivery Radius Surcharge $0 $5–$15 $40 Increases with distance
Soil Testing/Compaction $0 $0–$5 $15 Optional for engineering projects

Overview Of Costs

Typical cost range for fill dirt delivered by the yard is about $12-$45 per cubic yard, with overall project costs often between $200 and $1,000 for small to mid-size jobs. Costs vary by dirt type (common fill, topsoil, or specialized fill), distance, and whether the soil is loaded and transported by the supplier or by the buyer’s equipment. When planning, consider total project volume, disposal needs, and any site prep requirements.

Cost Breakdown

data-formula=”labor_hours × hourly_rate”>

Tables below show the main components and typical ranges.

Component Low Average High Notes
Materials $12/yd $25/yd $45/yd Delivery included in some quotes
Labor $0 $10/yd $25/yd Loader, operator, on-site handling
Delivery/Transportation $0 $5–$15 $40 Distance-driven surcharges apply
Permits & Disposal $0 $0–$5 $15 Depending on site rules
Delivery Window & Scheduling $0 $0–$5 $10 Peak seasons may push costs up

What Drives Price

Key price levers include dirt type, quantity, distance, and site access. Topsoil adds cost due to grading needs, while clean fill or stone-dust blends may be cheaper. Proximity to the supplier lowers delivery charges, and larger orders often receive volume discounts. Soil moisture, compaction requirements, and whether the fill must be compacted on-site also influence final pricing. For engineered fills, expect higher costs from testing and compaction specs.

Ways To Save

Smart planning can reduce overall spend by 15–40% in many cases. Compare quotes from multiple suppliers, schedule off-peak deliveries, and consolidate delivery windows to minimize trips. If feasible, arrange for self-loading with rented equipment, and select standard fill rather than engineered specialty soils. Clarify whether delivery charges include offloading and site preparation.

Regional Price Differences

Prices vary across the U.S. due to soil availability and labor costs. Urban areas typically incur higher delivery and permit costs; suburban regions often see moderate rates; rural locations may offer cheaper dirt but longer delivery distances. Expect roughly a ±20% variation between regions for the same volume and dirt type, with urban cores sometimes exceeding rural costs due to trucking limitations and disposal rules.

Labor, Hours & Rates

Labor cost is driven by on-site duration and crew size. A small crew may take a few hours for a modest yard, while larger fills could require half a day or more. Per-yard labor charges commonly range from $0 to $25, depending on equipment usage and site access. If the project includes grading or compaction, labor can extend the timeline and raise the price accordingly.

Additional & Hidden Costs

Hidden charges can appear at project close. Some suppliers apply fuel surcharges, loader fees, or minimum loading charges. Offloading at a hillside, behind obstacles, or on a slope may require additional personnel or equipment. If site access is restricted, expect longer delivery times and potential surcharge. Environmental restrictions or permit fees may add non-trivial amounts.

Real-World Pricing Examples

Three scenario cards illustrate typical projects. Each includes specs, hours, unit prices, and total estimates to help buyers compare options.

Basic Fill Project

Specs: 10 yd of clean fill delivered to a small residential yard; level area prep; no grading or compaction. Hours: ~2 on-site for settling.

Mid-Range Fill Project

Specs: 25 yd of standard fill with compaction to slight slope for drainage; delivery within 15 miles; basic site prep. Hours: ~6 on-site with a compacting plate.

Premium Fill Project

Specs: 40 yd of engineered fill, topsoil mix, grading and compaction to specification; delivery beyond 20 miles; permit coordination. Hours: ~10 on-site with larger crew.

Assumptions: region, specs, labor hours.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top