Cost Guide for 57 Stone Gravel 2026

The price of 57 stone varies by material, delivery, and installation scope. This guide presents realistic cost ranges in USD, with clear drivers and practical budgeting tips. The focus is on cost and price to help buyers build an accurate estimate.

Assumptions: region, material quality, delivery distance, vehicle access, and whether installation is included. Assumptions: region, specs, labor hours.

Item Low Average High Notes
Material (57 Stone, loose) $12/ton $28/ton $40/ton Includes quarry price and basic processing
Delivery (within 20 miles) $40 $70 $120 Distance affects fuel and access
Installation / Spreading $1.50/sq ft $3.50/sq ft $6.00/sq ft Includes leveling and edge work
Base & Preparation $0.50/sq ft $1.50/sq ft $3.00/sq ft Grading, weed barrier, and underlayment
Permits / Fees $0 $50 $200 Depends on local rules

Overview Of Costs

Typical cost range for 57 stone projects includes material, delivery, and installation. Material pricing is quoted per ton with a broad range due to quarry quality and distance. When installed, per-square-foot pricing combines spreading, base work, and edge finishing. A complete project usually lands in the mid-range if delivery is moderate and site access is straightforward.

Cost Breakdown

Material, labor, and ancillary costs each impact the total. Below is a practical breakdown using common assumptions for a 1000 sq ft area with standard access.

Category Low Average High Notes
Materials $1,200 $2,800 $4,000 57 stone at 2.6 tons per cubic yard; 1,000 sq ft area at 3 in depth
Labor / Installation $1,500 $3,500 $6,000 Prep, spreading, edging, compaction
Delivery $50 $100 $200 Distance and access dependent
Permits $0 $50 $200 Local requirements
Waste / Clean-Up $20 $60 $150 Site clearing after work

data-formula=’labor_hours × hourly_rate’> Total project estimate combines these components with contingencies for site challenges.

What Drives Price

Key cost drivers include material density, depth, and distance. 57 stone is heavier than typical topdressing gravels, so transport costs can scale quickly with weight. Depth choices (2 in vs 4 in) and edge type (curb, landscape border, or nothing) change both materials and labor math. SEER-like considerations do not apply here; instead, access, compaction needs, and weed barrier use shift the price.

Ways To Save

Early planning and bulk ordering can reduce per-ton costs. Consider combining delivery with other landscape materials to reduce trips. Choosing a lighter depth or a simpler edge finish lowers installation time and overall spend. If site access is tight, coordinating with the supplier to stage materials closer to the work zone can cut labor hours.

Regional Price Differences

Prices vary by region due to labor markets and truck rates. Three typical patterns are shown for a 1,000 sq ft area at 2 in depth:

  • Urban Northeast: higher base material and delivery, around +10% to +20% vs national average
  • Suburban Midwest: near national average with moderate delivery variance
  • Rural Southwest: potential savings of -5% to -15% on materials, but delivery may add cost if far

Labor, Hours & Rates

Labor typically dominates when site prep is extensive. Spreading and edging require skilled labor; rates commonly range from $40 to $70 per hour per crew. For a 1,000 sq ft project, expect 6–12 hours of crew time depending on slope, drainage work, and edging complexity.

Real-World Pricing Examples

Sample quotes reflect common scope variations. Each card shows a Basic, Mid-Range, and Premium scenario to illustrate cost spread. Assumptions: region, site accessibility, and material quality.

Basic aims for simplicity with minimal edging and standard-grade 57 stone. 2 in depth over 1,000 sq ft. Materials: 36 tons; Labor: 6 hours; Delivery: standard route. Total: around $1,700-$3,000. Per-unit: $1.50-$3.00 per sq ft for installation plus $12-$28 per ton for material.

Mid-Range adds edging, weed barrier, and moderate site prep. 2 in depth, 1,100 sq ft. Materials: 46 tons; Labor: 9–11 hours; Delivery: typical. Total: about $3,000-$5,500.

Premium factor includes 4 in depth, heavy edging, and complex slopes. 1,200 sq ft. Materials: 70 tons; Labor: 14–18 hours; Delivery: expedited. Total: $6,000-$9,500.

Assumptions: region, specs, labor hours.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top