Inground Pool Cost Ohio 2026

Prices for installing an inground pool in Ohio typically vary by pool type, site accessibility, and local permits. The main cost drivers include material choice, site preparation, and labor time.

Item Low Average High Notes
Materials (shell, liner, finish) $20,000 $35,000 $90,000 Vinyl, fiberglass, or concrete choices
Installation Labor $15,000 $25,000 $60,000 Excavation, steel, plumbing, electrical
Permits & Inspections $1,000 $3,000 $6,000 Depends on municipality
Delivery/Site Prep & Concrete Work $2,000 $6,000 $18,000 Earthmoving, decking, coping
Contingency (unexpected items) $2,500 $5,000 $12,000 Usually 5–15% of project
Taxes & Overhead $1,000 $3,000 $7,000 State/local charges
Total Project $41,500 $77,000 $193,000 Assumes mid-range site and standard features

Overview Of Costs

Cost ranges for inground pools in Ohio vary by type. Vinyl liner pools generally present lower upfront costs, while fiberglass and concrete pools incur higher shell and finishing expenses. Typical total project ranges span from about $35,000–$70,000 for basic vinyl setups to $60,000–$120,000 for mid-range fiberglass, and $70,000–$140,000+ for concrete systems.

Assumptions: region, site accessibility, equipment needs, and local permitting vary; orders often include basic decking and basic fencing.

Cost Breakdown

Columns Materials Labor Permits Delivery/Disposal Contingency Taxes Total
Low $20,000 $15,000 $1,000 $2,000 $2,500 $1,000 $41,500
Average $35,000 $25,000 $3,000 $6,000 $5,000 $3,000 $77,000
High $90,000 $60,000 $6,000 $18,000 $12,000 $7,000 $193,000

What Drives Price

Pool type is the largest driver: vinyl shells are cheaper upfront; fiberglass and concrete require more materials and labor. Assumptions: project scope includes basic decking and standard fencing.

Site preparation costs depend on slope, soil type, and tree removal needs. Steep sites or rocky soil raise excavation time and equipment use. Assumptions: accessible yard with moderate grading.

Regional Price Differences

Ohio pricing can shift by region. In urban areas, permit fees and labor rates tend to be higher than rural locations.

Illustrative regional delta (rough ranges): Northeast Ohio +5–10% vs. statewide average; Central Ohio +0–5%; Rural areas −5–15% depending on contractor availability.

Labor & Installation Time

Project duration typically ranges from 3–8 weeks, influenced by weather, permit processing, and site complexity. Labor costs are the main swing factor in Ohio projects, varying with crew size and local wage levels.

Mini formula: data-formula=”labor_hours × hourly_rate”> where labor hours depend on pool type, decking, and site prep.

Real-World Pricing Examples

Basic Vinyl, 10×20 pool with standard decking: Site prep 1–2 days, excavation, liner, basic decking, electrical rough-in. Labor 40–60 hours. Total: $40,000–$60,000. Assumptions: single-story property, normal soil.

Mid-Range Fiberglass, 12×24 with upgraded coping: Moderate site work, reinforced steps, standard decking, fencing add-ons. Labor 60–90 hours. Total: $70,000–$110,000. Assumptions: accessible yard, moderate grading.

Premium Concrete, 14×28 with custom finishes: Extensive excavation, gunite shell, plaster finish, premium coping and decking, enhanced lighting. Labor 90–140 hours. Total: $120,000–$180,000. Assumptions: complex site, multiple add-ons.

Additional & Hidden Costs

Some line items appear after signing a contract. These can include upgrades to concrete finish, enhanced filtration systems, landscaping, and permit appeals. Hidden costs often occur if site conditions require more excavation or unexpected code updates.

Common extras: fencing beyond minimum code, pool cover systems, deluxe lighting, and irrigation impacts to surrounding landscaping. Assumptions: no major code changes during construction.

Cost By Region

To illustrate regional variance, three sample zones are shown with approximate delta percentages versus statewide averages.

  • Urban Northeast Ohio: +5% to +10% on average project
  • Suburban Central Ohio: roughly ±0% to +5% on average project
  • Rural Northwest Ohio: −5% to −15% on average project

Pricing FAQ

Q: Do permits dramatically affect total cost? A: Permits commonly range from $1,000 to $6,000, depending on jurisdiction and required inspections.

Q: Is vinyl cheaper than concrete in Ohio? A: Generally yes for upfront cost, but long-term maintenance and finish durability influence total cost.

Q: What maintenance drives ongoing costs? A: Filtration, chemical treatments, and seasonal opening/closing add ongoing expenses.