Labor Cost to Install Cedar Shake Siding 2026

Cedar shake siding installation labor costs typically range from $2.50 to $6.50 per square foot, depending on board type, pitch, and access. Major cost drivers include crew size, job complexity, and regional wage differences. This article focuses on labor pricing, with clear low–average–high ranges and per-square-foot guidance.

Item Low Average High Notes
Cedar Shake Siding Labor (installed) $2.50/sq ft $4.50/sq ft $6.50/sq ft Assumes standard 6/12 pitch, smooth surfaces, ladder access
Labor Hours (per 100 sq ft) 6–8 hours 8–12 hours 12–18 hours Varies with complexity and waste
Crew Size (typical) 2 workers 3 workers 4 workers Higher crew speeds reduce calendar time
Minimum Charge / Visit $400–$600 $600–$1,000 $1,000–$1,600 Smaller jobs may incur a base fee

Overview Of Costs

Cost overview shows total project labor ranges along with per-unit details. A typical cedar shake install on a 1,000 sq ft exterior may span 8–14 days for a mid-size crew in standard conditions. Per-square-foot labor often dominates the total labor cost, while access and finish work add variability.

Cost Breakdown

Labor-driven cost components include crew wages, overtime premiums, and site setup. The table below focuses on labor-related elements; materials and other fees are separate.

Component Low Average High Notes
Labor $2.50 $4.50 $6.50 Per sq ft; assumes standard crew and conditions
Hours 6–8/100 sq ft 8–12/100 sq ft 12–18/100 sq ft Based on complexity
Overhead $0.50 $1.50 $2.50 Equipment, disposal, permits split
Permits $0 $0–$200 $200–$600 Depends on locality and scope
Waste & Cleanup $0.25 $0.75 $1.50 Includes debris removal

What Drives Price

Pricing variables include the cedar shake thickness, exposure, and board profile (straight-cut vs hand-split). Additional drivers are roof pitch, wall height, eave complexity, and accessibility, all of which alter labor hours and risk. Labor rates vary by region and contractor experience.

Ways To Save

Cost-saving tips focus on planning, material choices, and scheduling. Choosing standard profile shakes, prepping surfaces, and aligning installation season with milder weather can reduce labor time. Bundling fascia, trim work, and finish coatings may lower overall labor per project.

Regional Price Differences

Regional differences affect labor costs. In the Northeast, expect higher hourly rates due to union or supplier costs. The Midwest often shows moderate rates, while the West and some Southern markets can vary with demand. Typical regional delta ranges from ±10% to ±25% depending on local labor markets and permits.

Labor, Hours & Rates

Labor-hour framework helps estimate project duration and budget. Labor costs scale with square footage, crew size, and job complexity. A 1,500 sq ft project might need a 3–4 person crew for 14–22 days, with total labor costs reflecting both wage rates and time on site. Plan for potential overtime in peak season.

Additional & Hidden Costs

Hidden fees can include scaffold rental, dumpster fees, material handling surcharges, and weather-related delays. Some contractors bill for trip charges if the site is far from their base. Always confirm whether cleanup and disposal are included in labor estimates.

Real-World Pricing Examples

Assumptions: region, specs, labor hours.

style=”border:1px solid #ccc; padding:10px; margin-bottom:14px;”>
Basic — 1,000 sq ft, straight-cut shakes, 6/12 pitch, standard access, no special finishes. Labor: 8,000–9,500 hours? No, fix: 8–12 hours per 100 sq ft; Total labor: 8,000–12,000? That’s off. Correct: 1,000 sq ft at $2.50–$4.50 per sq ft equals $2,500–$4,500 labor, plus overhead and cleanup: total $3,000–$7,000.
style=”border:1px solid #ccc; padding:10px; margin-bottom:14px;”>
Mid-Range — 1,200 sq ft, hand-split shakes, 8/12 pitch, moderate access. Labor: $3.50–$5.50 per sq ft; Total labor: $4,200–$6,600; Overhead and cleanup add 15–25%. Estimated total: $4,800–$8,900.
style=”border:1px solid #ccc; padding:10px;”>
Premium — 1,800 sq ft, advanced profiles, custom detailing, high pitch, limited access. Labor: $5.00–$6.50 per sq ft; Total labor: $9,000–$11,700; Include permit and disposal surcharges. Estimated total: $10,500–$15,500.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top