A Belgard Bordeaux fireplace typically costs about $4,500-$8,500 for the fireplace kit and $9,000-$17,000 installed, depending on the supplier, site preparation, finish selections, and local labor. The final quote can rise when the project needs a substantial foundation, gas or electrical work, delivery by special equipment, or a larger patio installation.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| Fireplace kit | $4,500 | $6,500 | $8,500 | Price varies by dealer, included components, and finish |
| Installed fireplace | $9,000 | $13,000 | $17,000 | Standard site, foundation, and assembly; utilities may be extra |
| Installation labor | $2,000 | $3,800 | $6,000 | Assembly and setting; difficult access can add labor |
| Foundation and base | $800 | $1,600 | $3,000 | Depends on soil, excavation, and base dimensions |
| Gas connection, if needed | $500 | $1,200 | $2,500 | Long runs, permits, and shutoff changes can increase cost |
What a Belgard Bordeaux fireplace usually costs
The Bordeaux is a substantial outdoor fireplace, and its total price includes more than the visible kit. A typical completed installation falls near $9,000-$17,000 when the project includes the fireplace, a suitable base, delivery, assembly, and ordinary site cleanup. Quotes below that range may cover the kit alone or assume the homeowner supplies preparation and labor.
Plan on roughly $13,000 for a standard installed project, before optional patio expansion or utility upgrades. A dealer’s product price is not necessarily an installed price; confirm whether it includes the firebox, chimney components, hearth, delivery, mortar or adhesive, and assembly.
For a basic budget, allow $4,500-$8,500 for the kit, about $800-$3,000 for foundation work, and $2,000-$6,000 for installation labor. Delivery, disposal, and utility work can add several hundred to a few thousand dollars. Taxes are generally extra and vary by state and local jurisdiction.
Assumptions: U.S. pricing for a standard residential installation, ordinary access, a prepared or readily buildable location, and no major patio reconstruction.
How kit, base, delivery, and labor appear in quotes
Contractors may bundle several expenses into one installation figure, so a written estimate should identify the major inclusions. The ranges below are planning estimates, not fixed Belgard dealer pricing. A quote can vary with local material availability and the exact kit configuration.
| Quote component | Low | Average | High | Typical scope |
|---|---|---|---|---|
| Fireplace kit and components | $4,500 | $6,500 | $8,500 | Modular fireplace materials and specified finish |
| Base and foundation materials | $300 | $700 | $1,400 | Aggregate, concrete, reinforcement, and bedding |
| Foundation labor | $500 | $900 | $1,600 | Excavation, forming, pouring, and leveling |
| Assembly labor | $1,500 | $2,900 | $4,400 | Setting and joining fireplace components |
| Delivery and equipment | $250 | $650 | $1,400 | Freight, forklift, or placement assistance |
| Disposal and cleanup | $100 | $300 | $700 | Packaging, limited debris, and site cleanup |
Labor rates are often priced as a project rather than an hourly bill, but comparison estimates can use a rough labor calculation of 20-40 crew hours at $75-$125 per hour. Crew size and billed hours differ by contractor; the formula is a cross-check, not a guaranteed quote.
Ask whether foundation work and equipment rental are included before comparing bottom-line totals. A low bid that excludes excavation, delivery, or setting equipment may end up close to a more complete quote once those items are added.
How base dimensions, access, and utilities change the price
Ground conditions and placement are among the most important price variables. A level, accessible site with firm soil can keep the base near the lower end of the estimate. Sloped ground, soft soil, buried obstructions, or a location far from the driveway can require added excavation, material, and equipment.
Distance and foundation requirements can move a quote by hundreds or several thousand dollars. A short, unobstructed delivery path may need little more than a standard drop-off, while a narrow gate or placement more than 50 feet from vehicle access can call for a smaller carrier, forklift, or additional handling.
Base dimensions should follow the installer’s specifications for the selected Bordeaux configuration and local building requirements. A larger or reinforced concrete pad costs more than a simple prepared base. If the project also includes a patio, retaining wall, or seating area, those are separate scope items and should be listed independently.
Utility work changes the budget as well. A wood-burning installation avoids a gas line, but still needs safe clearances and any required inspection. A gas setup may need a new line, shutoff valve, connection, and permit. A gas run of more than 25 feet or a route through finished paving can cost substantially more than a short connection near an existing service.
Finish choices and included components also matter. Confirm what the quoted kit contains rather than assuming every hearth, chimney detail, cap, or accessory is included. Ask the supplier to identify the product configuration and any separately priced components on the estimate.
Why installed prices differ across U.S. regions
Regional pricing reflects labor availability, freight distance, local permitting, and the amount of outdoor construction contractors handle in a given market. As a broad planning comparison, installation in a lower-cost rural market may run about 10%-15% below a national midpoint, while a high-cost coastal metro can be 15%-30% above it. These are directional differences, not guaranteed local adjustments.
Location can change the installed total even when the same fireplace kit is specified. A dealer near a distribution point may offer a lower delivery charge than one arranging long-distance freight. In dense urban areas, restricted truck access, parking, stairs, or limited staging space can increase handling costs.
Weather and the local construction calendar also influence contractor availability. In colder regions, outdoor masonry work may be limited or require weather protection during part of the year. In warm regions, outdoor-living projects can remain active for longer, but peak demand may still raise labor rates or extend scheduling.
For a meaningful regional comparison, request at least two local estimates using the same kit configuration, base dimensions, delivery location, and utility scope. If one quote is 20% lower, check whether it omits freight, permits, site restoration, or debris removal instead of assuming the difference is a discount.
How many crew hours does Bordeaux installation take
A straightforward project may take two or three workers about one to two days for foundation preparation and fireplace assembly, with additional waiting time if concrete must cure before loading. Actual scheduling depends on the installer’s process, access, and whether the base already exists. Utility work or patio construction can add separate visits.
Foundation excavation and forming may take 4-8 crew hours on a clear, level site. Concrete placement and finishing can take another 3-6 hours, followed by a curing interval that is not active labor. Setting and assembling the fireplace commonly requires about 8-16 crew hours, depending on crew experience and how components arrive.
Allow one to three working days for a simple installation, not counting curing or permit delays. A sloped site, hand-carry access, or an existing patio that needs cutting can stretch the work to several days. If a contractor quotes a very short installation window, ask whether excavation, base construction, and cleanup are scheduled separately.
For a rough labor check, a two-person crew working 10-16 hours each represents 20-32 person-hours. At a comparison rate of $75-$125 per hour, that equals $1,500-$4,000 in labor before any specialty equipment, utility trade, or project management charges. Contractor billing methods vary, so this calculation should be used only to understand the quote.
What delivery, gas work, and patio extras add
Delivery commonly ranges from $250-$900 for a standard drop-off, but long-distance freight or restricted placement can raise it to $1,400 or more. Confirm whether unloading is included. A truck may leave the kit at the curb or driveway, while moving heavy components to the installation site may require a forklift or additional crew.
Utility connections and hardscape extensions are frequent reasons a project exceeds its initial allowance. A basic gas connection near an existing line may cost $500-$1,200. Longer runs, trenching, finished-patio restoration, meter changes, or inspection requirements can bring that work to $1,500-$2,500 or more.
Patio work should be separated from fireplace pricing. Extending paving around the unit may add roughly $12-$30 per square foot for common installed paver work, depending on excavation, paver selection, edge restraints, and regional labor. A 100-square-foot extension could therefore add about $1,200-$3,000, excluding unusually difficult grading or drainage work.
Other possible charges include removing an old fire feature, hauling excess soil, repairing lawn or paving, and obtaining permits. Ask for separate line items for each. That makes it easier to decide whether an accessory or surrounding improvement can be postponed without affecting the fireplace installation.
Three Bordeaux installation quotes with different scopes
These examples show how scope changes the total. They are budget scenarios rather than published prices for a specific dealer or address. Each assumes a standard residential property and excludes sales tax.
| Scenario | Included work | Estimated total | Cost detail |
|---|---|---|---|
| Prepared-site install | Kit, accessible delivery, existing suitable base, assembly | $8,000-$11,000 | Labor about 12-20 hours; no utility work |
| Typical new installation | Kit, modest concrete base, delivery, assembly, cleanup | $11,000-$15,000 | Labor about 24-36 hours; ordinary access |
| Expanded outdoor-living project | Kit, reinforced base, gas line, equipment, patio extension | $16,000-$24,000 | Labor and trade work about 40-65 hours; added hardscape |
In the prepared-site example, the lower total assumes the base meets the installer’s requirements and does not need repair. The typical project includes new foundation work, making it a more useful comparison for a buyer starting from an unfinished location.
Compare each quote by identical scope, not by its headline total. A $10,000 proposal with an existing base is not equivalent to a $13,000 proposal that includes excavation, concrete, delivery, and cleanup.
How to lower the Bordeaux fireplace price without cutting safety
The clearest savings come from limiting the project scope. Install the fireplace on a suitable, accessible part of the property rather than adding a large patio, retaining wall, or elaborate seating area at the same time. If those upgrades are desired, ask the contractor to price them as separate phases.
Keep the base, access route, and utility plan simple where site conditions allow. Clearing the work area, identifying underground utilities, and choosing a location close to delivery access can reduce handling and avoidable site labor. Homeowners should not excavate or alter a base unless the installer confirms the dimensions and construction requirements.
Compare at least three itemized bids using the same product configuration. Check whether each includes the kit, delivery, foundation, assembly, disposal, permits, and taxes. Ask the dealer whether a locally stocked unit or combined delivery with other landscape materials can lower freight, but verify that the included components match the planned installation.
Choose finishes and accessories based on the intended design rather than upgrading every visible component. Avoid paying twice for work that another contractor already includes, such as site cleanup or paver removal. Conversely, do not reduce cost by skipping a required foundation, proper clearances, code review, or a qualified gas connection.
Finally, schedule before peak demand when practical. Contractors may have more flexibility outside the busiest outdoor-construction months, although weather and regional availability matter. A written estimate should state the price-validity period and any allowances that could change after excavation reveals hidden site conditions.