The E700 Endless Pool price typically ranges based on installation, enclosure size, and added features. This article presents cost, price ranges, and practical budgeting details for U.S. buyers evaluating an E700 setup and related accessories.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| System price (base unit) | $28,000 | $32,000 | $36,000 | Assumes standard 10×6 ft enclosure |
| Installation and site prep | $6,000 | $9,000 | $15,000 | Includes concrete pad, electrical, plumbing |
| Electrical upgrade | $1,500 | $3,000 | $6,000 | GFCI, dedicated circuit |
| Delivery and crane | $800 | $2,000 | $4,000 | Depends on access |
| Shipping and handling | $1,000 | $2,000 | $4,000 | Region dependent |
| Site finishes and enclosure | $4,000 | $8,000 | $14,000 | Wood, vinyl, or concrete finish |
Assumptions: Midwest labor rates, standard enclosure, normal access.
Base E700 Price vs Regional Variations
Understanding regional differences helps set realistic budgets. The base E700 price often falls in the $28,000–$36,000 range, depending on enclosure material and included features. In coastal zones with higher labor rates, expect toward the high end of the range; inland regions may land closer to the mid-point. Per-square-foot enclosure costs can vary from about $200 to $350, depending on materials and finishes.
| Region | Base System | Enclosure (+/−) | Typical Total |
|---|---|---|---|
| Northeast | $30,000 | $8,000 | $46,000 |
| Southeast | $29,000 | $7,000 | $42,000 |
| Midwest | $28,000 | $6,000 | $40,000 |
| West | $31,000 | $9,000 | $48,000 |
Four Major Cost Components in an E700 Quote
Pricing splits show where most spend occurs: equipment, site work, electrical, and enclosure finishes. The quote typically items these areas into four to six lines, with indicative dollar ranges for each as shown below.
| Category | Low | Average | High | Notes |
|---|---|---|---|---|
| Equipment and system | $28,000 | $32,000 | $36,000 | Includes pump, controls, and filtration |
| Site prep and foundation | $6,000 | $9,000 | $15,000 | Concrete pad or footing system |
| Electrical work | $1,500 | $3,000 | $6,000 | GFCI and dedicated circuit |
| Enclosure finishes | $4,000 | $8,000 | $14,000 | Wood, stone, or vinyl options |
| Delivery and installation | $1,800 | $3,000 | $5,000 | Labor and equipment transport |
| Permits and inspections | $400 | $1,000 | $2,000 | Local code requirements |
Key Variables That Drive the Final E700 Price
Scale and scope shift the total quickly: enclosure size and water capacity are primary drivers. Quantities like enclosure length (6–8 ft), width (10–12 ft), and depth add thousands. The choice of material for the enclosure (fiber-reinforced concrete vs. wood vinyl) can swing costs by $3,000–$8,000. If extra features such as automated cover systems or advanced lighting are chosen, expect additional $2,000–$6,000.
- Enclosure size: 6×10 ft to 8×12 ft variants
- Material tier: basic vinyl vs premium stone veneer
- Electrical upgrades: 240V vs 480V service
- Delivery access: single- vs two-person installation
- Additional features: fiber optic lighting, auto-cover, or water treatment upgrades
Practical Ways to Cut E700 Costs Without Compromising Essentials
Smart scope control can trim substantial costs. Consider prefabricated enclosure kits or standard finishes, schedule installation in off-peak months, and bundle delivery with other home renovations. If a full enclosure isn’t required, opting for a partial above-ground installation may save 20%–40% on site work and enclosure costs. Reassess luxury features like premium finishes or custom lighting if a lean setup meets needs.
Labor Metrics and Timing That Affect Quotes
Labor hours and crew size translate directly to price swings. Typical installation times range from 6 to 12 days of on-site work, depending on access and site preparation. A two-person crew vs a larger team can alter labor totals by 15%–30%. Scheduling delays due to weather or permitting can add additional days, effectively increasing overall cost by 5%–15% in many markets.
Sample Quote Scenarios for Quick Budget Checks
Realistic quotes help buyers compare options. Scenario A assumes a standard 6×10 ft enclosure with mid-range finishes and a 240V circuit. Scenario B uses a larger 8×12 ft enclosure with premium finish and upgraded electrical. Scenario C reflects a tight-site, minimal-finishes approach.
| Scenario | Equipment | Site Work | Electrical | Enclosure | Total |
|---|---|---|---|---|---|
| Scenario A | $32,000 | $7,000 | $2,500 | $6,000 | $47,500 |
| Scenario B | $34,000 | $9,500 | $4,000 | $9,000 | $56,500 |
| Scenario C | $29,000 | $5,000 | $2,000 | $5,500 | $41,500 |
How Per-Unit and Per-Job Pricing Apply to E700
Pricing can be shown as per-unit or per-job figures. If quoting by unit, enclosure costs may be quoted per linear foot (e.g., $1,200–$2,000 per included foot for certain finishes) or per square foot of enclosure area. For a completed system, expect a bundled per-job total in the $40,000–$60,000 range, with regional adjustments.
Delivery, Disposal, and Waste Handling Matters
Logistics add non-trivial charges. Transportation, crane work, and disposal of old materials can range from $1,000 to $5,000 depending on site distance and debris volume. Some shops include delivery within the base price; others itemize it separately to reflect location challenges. Confirm haul-away costs and any permit-related disposal fees in the quote.
Compare the E700 to Alternatives: When to Choose or Reconsider
Cost comparisons help decide between full install and partial upgrade. An alternative may be a smaller or modular Endless Pool model or a different pool solution that provides similar benefits at a lower upfront price. If the project goal is mainly aerobic training or relaxation, a more compact enclosure with a simpler pump system can cut costs by 20%–35% while delivering essential functionality.
Plan for Permits, Inspections, and Local Rules
Regulatory steps can affect timing and price. Permit fees typically range from $400 to $2,000 and can require structural assessments or electrical inspections. In some jurisdictions, erosion control or drainage permits may add to the cost. Budget a 5%–15% contingency for permitting delays and inspection rechecks.