How Much Does It Cost to Stucco a Mobile Home? 2026

Stuccoing a mobile home typically costs $10,000-$30,000, with an average project near $18,000 for a modest single-wide. The final price depends on wall area, the home’s existing siding and frame, preparation needs, stucco system, local labor rates, and whether the structure can support the added weight.

Item Low Average High Notes
Complete exterior project $10,000 $18,000 $30,000 Typical single-wide or smaller double-wide; repairs and access affect totals
Installed wall area $8 per sq ft $13 per sq ft $20 per sq ft Includes typical materials and installation, not major structural work
Existing siding removal $1 per sq ft $2.50 per sq ft $5 per sq ft Higher for multiple layers or difficult disposal
Structural or moisture repairs $500 $2,000 $6,000+ Depends on rot, framing, sheathing, and water damage

Typical stucco prices for single-wide and double-wide homes

Contractors generally estimate the job by exterior wall area, not the home’s interior floor space. A 14-by-70-foot single-wide may have roughly 1,000-1,300 square feet of exterior wall before subtracting openings. A 28-by-60-foot double-wide can have around 1,500-1,900 square feet, depending on wall height, roofline, and layout.

At $8-$20 per square foot installed, a straightforward single-wide may cost about $10,000-$22,000. A larger double-wide often falls between $16,000 and $35,000. The low end usually assumes sound, compatible backing and simple access; the high end can include siding removal, added sheathing, reinforced attachment, and detailed trim.

A planning budget of $12-$16 per square foot of wall area is reasonable for a standard retrofit with ordinary preparation. This is not a guaranteed quote: mobile homes vary in construction, and a contractor may recommend a lighter exterior system or decline conventional stucco if the walls cannot support it.

Assumptions: U.S. average labor, one-story home, standard finish, normal site access, and no extensive rot or framing replacement.

What lath, base coats, and labor add to the quote

A stucco estimate should explain the backing and attachment method, not just list a finish price. Manufactured homes may have thin siding, flexible framing, or existing panels unsuitable for direct stucco application. A contractor may need to remove siding, add a stable substrate, install water-resistive layers, and use lath and joints designed for the structure.

Quote component Typical range How it is priced What changes the charge
Surface prep and removal $1-$5 per sq ft By wall area Layer count, debris, and siding condition
Sheathing, moisture layer, and flashing $2-$6 per sq ft By area and detail Wall repairs, windows, and required drainage details
Metal lath and attachment $1.50-$4 per sq ft By covered area Substrate type and fastening requirements
Stucco coats and finish material $2-$5 per sq ft By finish and system Traditional cement versus lighter acrylic finish
Installation labor $4-$10 per sq ft By area or crew time Access, detailing, weather, and crew rates
Equipment, disposal, and overhead $500-$3,000 total Project allowance Scaffolding, hauling, protection, and travel

Labor and correct wall preparation are often the largest parts of a mobile-home stucco quote. For a 1,300-square-foot wall area, labor alone could be approximately $5,200-$13,000 at the per-square-foot rates above. Contractors may instead price by crew hours; a rough labor calculation is shown here: . Local hourly rates commonly run $50-$100 per worker, but a bid should specify the crew and included tasks.

How wall area, framing, and finish choice change the price

Wall area is the first major driver. A home with 1,000 square feet of wall may cost thousands less than one with 1,800 square feet, even if both have similar floor plans. Gables, porches, bay windows, and attached additions increase the area or require slower detail work. Contractors may subtract large doors and windows, though their edges still need careful finishing.

The existing wall assembly matters as much as the square footage. Applying heavy cement stucco over unsupported metal siding is not a safe shortcut. If the home needs new sheathing or a reinforced attachment system, those materials and labor can add $2,000-$8,000 or more. If inspection reveals soft framing or widespread water damage, repairs may exceed that range.

Finish and system selection also affect cost. A conventional multi-coat cement system often lands around $8-$16 per square foot when the backing is suitable. Acrylic or other lightweight finish systems may cost $10-$20 per square foot installed, depending on the approved assembly and finish. Their lighter weight can be useful, but they still require compatible backing and manufacturer-compliant installation.

Ask for the proposed finished wall weight and attachment details before approving a stucco system. Mobile homes differ in frame design and age, so a contractor should verify suitability instead of assuming that a standard site-built-house detail applies.

How long does stucco installation take on a mobile home?

A straightforward single-wide job may take a crew of three or four about 7-12 working days on site. A double-wide or a project requiring siding removal, sheathing, and extensive trim can take 2-4 weeks. These estimates describe active work, not necessarily the calendar time from signing to completion.

Traditional cement stucco needs appropriate drying and curing time between coats. Rain, cold, strong sun, and high winds can delay application or require added protection. Acrylic finishes may have different installation schedules, but the base preparation and weather conditions still matter. A contractor should state expected workdays, curing periods, and how weather delays are handled.

Longer schedules can raise labor and equipment charges when scaffolding, protection, or repeated mobilization is needed. A detailed quote should say whether the price includes setup, cleanup, material delivery, and return visits.

Extra charges for old siding, windows, and moisture repairs

Removal is not always necessary, but covering existing siding without checking its condition can trap moisture or create an unstable base. If removal is required, budget roughly $1-$5 per square foot for labor and disposal. Multiple siding layers, brittle panels, or difficult access can move the bill toward the upper end.

Window and door detailing can add $100-$400 per opening when flashing, trim, or custom edge work is required. Replacing damaged window flashing or installing new trim around many openings can add $500-$2,000. Gutter removal and reinstallation, skirting adjustments, and moving exterior fixtures may each add a few hundred dollars.

Rot repair is less predictable. Replacing a limited area of sheathing may cost $300-$1,500, while repairing several wall sections or framing members can cost $2,000-$6,000 or more. A pre-work inspection and written allowance for concealed damage help prevent surprises. Permits are not universal; local fees may be $50-$500, and some jurisdictions require plans or inspections for exterior alterations.

Keep a 10%-15% contingency for concealed damage when the existing siding or moisture barrier is uncertain. The contractor should distinguish an allowance from work already included in the base price.

Three sample mobile-home stucco quotes by project size

These examples show how wall area and preparation can produce different totals. They assume ordinary access and U.S. labor pricing; local estimates may be higher or lower. The per-square-foot amounts use exterior wall area rather than floor area.

Scenario Scope and wall area Labor and unit rate Estimated total
Small single-wide 1,050 sq ft; sound backing, basic finish About 90-110 crew hours; $9-$12 per sq ft $9,500-$12,600
Typical single-wide retrofit 1,300 sq ft; selective siding removal and new backing About 150-190 crew hours; $12-$16 per sq ft $15,600-$20,800
Double-wide with repairs 1,750 sq ft; siding removal, sheathing repairs, upgraded finish About 220-280 crew hours; $15-$20 per sq ft $26,250-$35,000

Compare the scope line by line, because a low total may exclude backing, flashing, disposal, or wall repairs. The hours are illustrative crew labor, not a promise of project duration; crew size and staging determine how those hours translate into days.

Regional labor rates shift the installed price

Prices tend to be higher in major coastal metros and lower in some rural markets, although local contractor availability and material delivery can reverse that pattern. For a comparable scope, a high-cost urban market may run 15%-30% above a national midpoint. A rural area with fewer stucco crews may be 5%-20% higher than expected because of travel and minimum charges.

Warm regions with established stucco trades can have more competitive labor, while areas where stucco is uncommon may require a specialist to travel. In parts of the Northeast and Midwest, freeze-thaw conditions and local code requirements can affect system selection, preparation, and scheduling. Material delivery to a remote property can add $100-$800, particularly for small jobs or limited-access sites.

Use local quotes for the final budget rather than applying a single national rate. When comparing bids, check whether the quoted square footage, material system, disposal, and repair allowances match; regional price differences are meaningful only when the scopes are comparable.

How to lower the stucco bill without cutting necessary protection

Start by measuring the exterior wall area and asking contractors to show their calculation. Confirm which siding must be removed and whether sound sections can remain as part of an approved assembly. Avoid paying for a full replacement of components that are in good condition, but do not skip moisture control, flashing, or a stable attachment surface to save a small amount upfront.

Choose a standard texture and color rather than custom finishes, and keep trim details simple where water management allows. Schedule during a contractor’s less crowded period if weather permits; off-season availability may improve scheduling, though cold or wet conditions can make stucco work unsuitable. Combining fascia, trim, or exterior repair work may reduce separate mobilization charges.

Get at least three written estimates and request separate prices for preparation, backing, lath, finish, labor, disposal, and repairs. Check that each bidder understands the home is manufactured housing and identifies the proposed wall assembly. A very low price that assumes direct application over existing siding may omit essential work or create a failure risk.

The safest savings usually come from controlling finish choices and avoiding duplicate work, not from reducing substrate or water-management steps. If a full stucco assembly is too costly or structurally unsuitable, compare a compatible lightweight exterior coating or replacement siding; those alternatives may cost less and place less weight on the walls.