Pitaya White Granite Price Per Square Foot and Installed 2026

Pitaya White granite typically costs $65-$145 per square foot installed, with many standard kitchen projects landing near $95 per square foot. Slab grade, countertop area, edge details, sink cutouts, local labor, and whether old counters need removal have the biggest effect on the quote.

Item Low Average High Notes
Installed countertop $65/sq ft $95/sq ft $145/sq ft Fabrication and standard installation included
Stone material $35/sq ft $60/sq ft $95/sq ft Supplier grade and slab availability matter
Typical 40-sq-ft kitchen $2,600 $3,800 $5,800 Before unusual prep or premium upgrades

Assumptions: U.S. pricing for a standard kitchen, ordinary access, and a common eased edge.

What installed Pitaya White granite costs for a kitchen

For a 30- to 50-square-foot countertop, a practical installed budget is about $1,950-$7,250, with approximately $3,800 for a 40-square-foot midrange job. That range generally covers the stone, measuring, fabrication, cutouts for a typical sink and cooktop, and installation. It may not include plumbing reconnection, demolition, backsplash material, or sales tax.

Granite is often quoted by finished countertop area, but a fabricator may price from the slab needed to match the pattern and minimize seams. A small project can therefore cost more per square foot than a large kitchen. Confirm whether the quote is based on installed area or slab use, and ask what fabrication is included.

How slab, fabrication, and labor shape the quote

Stone is only part of the total. Fabrication includes cutting the slab to the template, finishing exposed edges, and making sink or appliance openings. Installation labor covers transport, positioning, seam work, and securing the countertop. The table shows common planning ranges; local quotes vary by shop and project.

Quote component Typical range Pricing basis What changes it
Granite slab $35-$95 Per sq ft Grade, color movement, source, and slab selection
Fabrication $15-$35 Per sq ft Cutouts, seams, edge profile, and layout
Installation labor $10-$25 Per sq ft Access, crew size, and countertop weight
Equipment and delivery $150-$600 Per project Distance, stairs, and handling requirements
Removal and disposal $5-$15 Per sq ft Existing material and disposal fees

Fabrication and installation labor commonly works out to roughly $50-$100 per crew-hour, though many shops bundle labor into a per-square-foot quote. Check that the estimate separates stone, fabrication, installation, and removal charges.

Which slab size and edge details raise the price?

Two project details can change the number sharply: layout and specifications. A kitchen with 25-30 square feet may need more material than its finished area suggests if the slab layout creates substantial waste. A longer island or peninsula may require a larger slab or a seam, especially when the stone’s veining must align.

Standard eased or pencil edges are commonly included or add about $5-$15 per linear foot. Decorative ogee or laminated edges may add $20-$45 per linear foot. A sink cutout often costs $150-$350, while a cooktop opening may add $100-$250. A waterfall end can add $800-$2,000 or more per side because it uses extra stone and precision fabrication.

Ask to view the actual slab and approve the proposed seam locations before fabrication. Pitaya White is a natural stone, so slab appearance and availability can vary even when suppliers use the same name.

How long do measuring, fabrication, and installation take?

After a deposit and slab selection, template measurement is often scheduled within several days to two weeks. Fabrication commonly takes 5-10 business days after templating, while installation usually takes 4-8 hours for a straightforward kitchen. Complex islands, multiple seams, or difficult access can extend the work or require a larger crew.

Countertop installers may charge a minimum job fee, commonly $500-$1,000, for small orders. Plumbing disconnection and reconnection can add $150-$400 if handled separately. Confirm the schedule and whether the installer or homeowner arranges plumbing, appliance removal, and cabinet preparation.

Why Pitaya White granite quotes vary by region

In high-cost metro areas, installed prices may run 10%-25% above typical national ranges because of wages, shop overhead, and delivery expenses. Smaller towns may price 5%-15% below metro averages, but limited slab selection or a long haul from the fabricator can offset those savings. Freight can add roughly $150-$500 when the supplier is far from the project.

Compare quotes using the same slab, countertop measurements, edge, cutouts, removal scope, and tax treatment. A lower per-square-foot rate may exclude delivery, sink openings, or installation. Request an itemized quote rather than comparing only the advertised stone price.

Which extras add removal, backsplash, or sealing charges?

Old countertop removal commonly adds $200-$700 for a typical kitchen, with more for heavy stone or difficult access. A matching granite backsplash may cost $10-$30 per linear foot for a short splash, while full-height stone backsplash panels can add $25-$60 per square foot installed. Sink and faucet reconnection is often a separate plumbing expense.

Granite is usually sealed during fabrication or installation, but the included treatment and care instructions vary. If a shop charges separately, basic sealing may add $100-$250. Permit requirements are uncommon for a countertop-only replacement, but plumbing or electrical changes may trigger local rules. Have every exclusion written down before approving the deposit.

Three Pitaya White countertop quotes by project size

These examples show how area and scope affect a quote; they assume standard access and no major cabinet repairs. Actual slab yield and local rates can shift totals.

Project Scope Estimated total Approximate rate
Small vanity 8 sq ft, one sink cutout, eased edge $700-$1,150 $88-$144/sq ft
Standard kitchen 40 sq ft, sink and cooktop cutouts, removal $3,300-$5,400 $83-$135/sq ft
Large kitchen with island 65 sq ft, extra seam work, premium edge $5,500-$9,200 $85-$142/sq ft

Compare the scope line by line because a small vanity can have a higher per-square-foot rate despite a lower total bill.

How to lower the granite price without changing the look

Use a standard edge, keep the backsplash limited to a short splash, and avoid extra cutouts that do not serve a specific appliance. Choosing a remnant can reduce the stone charge for a vanity or small counter, but a full kitchen usually needs a full slab. Ask the fabricator whether the selected slab can yield the layout with fewer seams or less waste.

Get at least three itemized bids and compare the same material grade and installation scope. Removing an old laminate counter yourself may save money if the shop permits it and the cabinets remain protected; removing heavy stone is better left to an insured crew. The most reliable savings come from controlling layout and add-ons, not accepting an incomplete low bid.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top