On Site Temporary Housing Cost: Price Guide 2026

On-site temporary housing costs depend on unit count, duration, amenities, and service levels. Key drivers include unit size, utility hookups, delivery, installation, and ongoing maintenance. This guide provides cost ranges in USD to help buyers estimate project budgets and compare options.

Assumptions: region, project duration, unit type, and required utilities vary by site.

Item Low Average High Notes
Modules/Units (new, furnished) $8,000 $14,000 $28,000 Per unit; 10–20 ft widths common
Site Preparation & Utilities (grading, power, water) $4,000 $9,000 $22,000 Includes trenching and hookups
Delivery & Installation $3,000 $6,000 $12,000 Crane, flatbed, crew time
Permits & Inspections $500 $2,000 $6,000 varies by locality
Furnishings & Equipment $2,000 $5,000 $12,000 Beds, kitchen, HVAC, appliances
Maintenance & Security $600/year $2,400/year $6,000/year Monthly services included
Utilities (electric, water, waste) $500 $1,500 $4,000 Depending on occupancy
Decommissioning & Disposal $1,000 $3,000 $7,000 Unit removal and site restoration

Overview Of Costs

Typical ranges cover full project life from setup to removal. For a small camp (4–6 units) planned for 3–6 months, total project costs often fall in the $60,000-$120,000 range. For larger camps (10–20 units) lasting 6–12 months, costs commonly run $180,000-$420,000. Assumptions include standard furnished units, basic utilities, and mid-tier maintenance.

Per-unit pricing helps compare options. A single unit might cost $8,000-$14,000 upfront, plus monthly operating costs in the $1,000-$3,000 range depending on occupancy and services.

Cost Breakdown

Category Low Average High Assumptions Notes
Materials $4,000 $9,000 $18,000 Modular shells, interior finishes Per unit
Labor $2,500 $5,500 $11,000 Crew hours × hourly rate Includes install and hookups
Equipment $500 $2,000 $5,000 Temporary cranes, skids Depreciates after project
Permits $250 $1,500 $4,500 Local approvals
Delivery/Disposal $1,500 $3,500 $7,000 Transport to site; end-of-project removal
Warranty & Service $300 $1,200 $3,000 Limited coverage

data-formula=”labor_hours × hourly_rate”> Labor costs vary by crew availability and region. Expect higher rates in markets with skilled labor shortages or remote sites.

What Drives Price

Project duration and unit count are primary levers. Longer leases and larger camps increase recurring utilities, maintenance, and security needs. Unit quality, interior finishes, and included furnishings also shift the total. HVAC type (central vs. mini-splits) and energy efficiency can alter monthly operating costs by 10-25%.

Regional Price Differences

Prices vary by location and market conditions. In the Northeast urban core, costs tend to be 10-20% higher than national averages due to labor and permitting. In the Midwest suburban markets, expect near-average costs with moderate delivery charges. Rural areas may offer 5-15% lower delivery and logistics costs but can incur higher security and utility connection fees.

Labor & Installation Time

Turnaround times depend on site readiness and crew availability. Typical installation takes 1–3 weeks for a small camp and 4–6 weeks for larger deployments. For weather-sensitive regions, schedule buffers of 1–2 weeks to account for delays.

Additional & Hidden Costs

Some expenses appear later in the project. Examples include long-term water/sewer hookups, temporary road repairs, site fencing, decommissioning, and potential surge charges for peak delivery windows. Insurance adders or site access restrictions can also influence total spend.

Real-World Pricing Examples

These scenarios illustrate common configurations and outcomes.

Basic Scenario

Specifications: 4 furnished modules, shared utilities, 3 months, rural site. Labor hours: 120; Materials: $28,000; Total: $48,000–$60,000. Assumptions: rural site, moderate utility setup.

Mid-Range Scenario

Specifications: 8 furnished modules, individual HVAC, 6 months, suburban site. Labor hours: 260; Materials: $60,000; Total: $140,000–$180,000. Assumptions: standard upkeep, partial on-site crew.

Premium Scenario

Specifications: 15 furnished modules, full amenities, central HVAC, 12 months, urban site. Labor hours: 520; Materials: $140,000; Total: $350,000–$420,000. Assumptions: enhanced finishes, high security, testing & commissioning included.

Ways To Save

Strategies focus on efficiency and scope alignment. Negotiate multi-unit pricing, opt for modular construction with durable finishes, and plan for longer but well-defined occupancy to secure lower per-month rates. Consider shared utilities, staged deployment, and bundled maintenance to reduce administration costs.