Wilsonart Solid Surface Price Per Square Foot and Installed Cost 2026

Wilsonart solid surface countertops typically cost about $45-$90 per square foot installed, with many standard kitchen projects landing near $65 per square foot. Material selection, countertop size, cutouts, edge details, removal, and local labor rates have the biggest effect on the final quote.

Item Low Average High Notes
Installed countertop $45 per sq ft $65 per sq ft $90 per sq ft Fabrication and standard installation
Material only $20 per sq ft $32 per sq ft $50 per sq ft Varies by design and supplier
Typical kitchen project $1,800 $3,250 $6,300 About 40-70 sq ft, before unusual upgrades

What Wilsonart solid surface costs for a typical kitchen

For a standard 40-70-square-foot kitchen, a practical installed budget is about $1,800-$6,300, with a common midrange project around $3,250. Smaller bathroom vanities may cost $500-$1,500 installed, depending on size and sink configuration. These estimates assume ordinary access, standard fabrication, and no extensive cabinet changes.

Installed pricing commonly runs $45-$90 per square foot. Simple colors and layouts tend toward the low end; premium patterns, seams, custom edges, and more complicated cutouts raise the rate. A fabricator’s quote may price the job by slab, template, or project rather than showing a simple square-foot charge.

Assumptions: U.S. midrange labor, standard residential thickness, typical kitchen access, and no structural or plumbing work.

How fabrication, labor, and cutouts shape the quote

Material is only one part of a countertop estimate. Fabrication includes templating, cutting, seam work, sink openings, edge finishing, and polishing. Installation covers placing and joining the sections, securing them, and finishing seams. Ask whether the quote includes removal of the old top and disposal.

Quote component Typical price What changes the charge
Wilsonart material $20-$50 per sq ft Color, pattern, supplier, and sheet yield
Fabrication $15-$35 per sq ft Seams, sink openings, and edge profile
Installation labor $10-$25 per sq ft Access, layout, and job size
Sink or cooktop cutout $100-$300 each Opening size and edge finishing
Old countertop removal $150-$500 total Material weight and disposal distance

Confirm whether fabrication and installation are separate line items. The labor portion can be estimated as ; countertop crews and fabricators commonly charge an effective $50-$100 per labor hour, although many bundle labor into a project price.

When thickness, seams, and sink openings raise the price

Area and layout matter as much as the selected color. A simple run under 40 square feet may have a higher per-square-foot rate because templating and mobilization are spread across less material. Kitchens above 70 square feet need more material and may require additional seams, especially around islands or L-shaped runs.

Each additional cutout or seam can add roughly $100-$300. A standard 1/2-inch sheet is common, while thicker-looking edges often use a built-up edge rather than a full-thickness slab. Intricate edge profiles may add $10-$30 per linear foot; a standard eased edge is generally less costly.

Access can also change the bid. Narrow stairways, long carries, uneven cabinets, or an installation requiring extra on-site adjustments may add $200-$800. Cabinet repairs or leveling are usually separate from countertop installation.

How long Wilsonart countertop installation takes

After measurements and material selection, fabrication often takes about 1-3 weeks, though local availability and workload can extend the schedule. On installation day, a straightforward kitchen commonly takes 4-8 hours for a small crew. Larger layouts, multiple seams, or complicated sink connections may require more time or a return visit.

Countertop removal and installation are usually separate work phases. Confirm whether the installer disconnects plumbing or whether a plumber must return after the new top is in place. Plumbing reconnection may add about $150-$400, depending on the sink and local service rates.

How Wilsonart countertop prices vary across U.S. markets

Labor and delivery differences can shift installed prices by roughly 10%-25%. Major coastal cities and other high-cost metro areas may run 15%-25% above a typical midrange quote. Smaller cities and rural markets can be 5%-15% lower, but limited fabricator availability or long delivery distances may offset those savings.

Compare local quotes using the same measurements and inclusions. A low bid that excludes removal, sink cutouts, or finished edges may not be less expensive after those items are added. Rates also depend on the fabricator’s access to the chosen Wilsonart design.

Three Wilsonart project examples with realistic totals

Project Scope Estimated total
Bathroom vanity 12 sq ft, one sink cutout, standard edge $650-$1,200
Compact kitchen 40 sq ft, one sink cutout, old top removed $2,200-$3,600
Large kitchen with island 70 sq ft, two cutouts, multiple seams, upgraded edge $4,500-$7,000

Project totals depend on fabrication details, not just countertop area. These examples assume standard cabinet conditions and typical regional labor; plumbing, cabinet repairs, backsplash work, and premium design selections may increase the bill.

Where to trim a Wilsonart solid surface budget

Keeping the layout simple is one of the most effective ways to control fabrication expense. Standard eased edges, fewer seams, and common sink shapes generally cost less than custom profiles or specialty openings. Selecting a design available from a nearby supplier may also reduce delivery delays or freight charges.

Request comparable written quotes before approving custom work. Provide each fabricator with the same measurements, sink model, edge choice, removal requirements, and backsplash scope. If cabinets are sound, avoid bundling unrelated cabinet upgrades into the countertop job; if the old top is already removed, confirm that the quote credits any excluded demolition charge.