A WoodMaster CleanFire 700 typically costs about $12,000-$19,000 for the furnace alone, while a complete installed system often totals $20,000-$34,000. The final price depends on dealer pricing, required underground pipe and controls, chimney and pad work, labor rates, and whether the project replaces existing equipment.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| CleanFire 700 furnace | $12,000 | $15,500 | $19,000 | Equipment estimate; confirm current dealer quote and included parts |
| Installed system | $20,000 | $26,500 | $34,000 | Typical new installation with standard site access |
| Underground insulated pipe | $10/ft | $18/ft | $30/ft | Pipe type, diameter, and trench conditions affect price |
| Annual wood fuel | $500 | $1,200 | $2,500 | Varies with climate, wood source, and heating demand |
What a CleanFire 700 furnace and installed system cost
The furnace-only range is a planning estimate, not a guaranteed advertised price. WoodMaster dealer quotes may bundle delivery, controls, or accessories differently, and local inventory can change the equipment price. A full system includes the furnace plus the work and materials needed to connect it safely to the building’s heating system.
Budget roughly $20,000-$34,000 for a standard installed project. The lower end assumes an accessible site, a relatively short pipe run, and compatible indoor heating equipment. A longer trench, difficult excavation, electrical work, or substantial plumbing changes can push the project above that range.
Assumptions: U.S. residential installation, standard materials, normal access, and no major indoor heating-system replacement. The CleanFire 700’s output and suitable building size should be verified from the model’s current nameplate and dealer specifications; heating needs depend on insulation, climate, and other heat loads.
How furnace, trench, and connection charges build the quote
A useful estimate separates the furnace from site work and system connections. Ask whether the quote includes freight, tax, chimney components, pumps, and startup; otherwise, an apparently low equipment price may not reflect the amount required to operate the system.
| Quote component | Typical range | What changes the charge | Pricing basis |
|---|---|---|---|
| Furnace and standard controls | $12,000-$19,000 | Dealer package, included accessories, availability | Per unit |
| Labor and plumbing connection | $2,500-$6,000 | Existing boiler compatibility and crew hours | $75-$150/hour |
| Insulated underground pipe | $10-$30/ft | Pipe construction, diameter, and length | Per linear foot |
| Excavation and site preparation | $1,000-$5,000 | Soil, slope, access, and trench length | Project total |
| Electrical, chimney, and startup | $800-$3,000 | Existing wiring, chimney needs, and commissioning | Project total |
Labor costs rise when the installer must modify several parts of the existing heating system. Some bids also include removal of old equipment or a concrete pad; these should be listed separately so the scope can be compared accurately.
Which 700 model details and site conditions raise the price?
Distance between the outdoor furnace and the building is one of the clearest cost drivers. A 50-foot run may need about $500-$1,500 in insulated pipe, while a 150-foot run may reach $1,500-$4,500 before excavation and connections. These examples use the table’s approximate per-foot range and exclude unusual obstacles.
Trench depth, rocky ground, drainage, and vehicle access affect excavation. A straightforward trench can stay near $1,000-$2,000, while difficult digging or restoration of landscaping can take the work toward $5,000 or more. Pipe size and heat-loss requirements should follow the manufacturer’s installation specifications, not an assumption based only on distance.
Confirm the exact model, rated output, and included accessories on the written quote. If a quote describes the unit simply as “700,” ask the dealer to document the full model designation and capacity. Regional code requirements and the building’s existing boiler, baseboard, or radiant system can also require additional valves, pumps, or controls.
How much installation labor and time should buyers expect?
A typical installation may take two or three workers one to three days, or roughly 24-72 combined labor hours. The lower end applies to a prepared site and simple connection; a long trench, difficult excavation, or indoor plumbing changes can require more time and multiple visits.
At an estimated $75-$150 per labor hour, 24-72 hours equates to $1,800-$10,800 before materials. That broad calculation is not a stand-alone labor quote: contractors may price excavation by the job, and the installed-system range includes several cost categories. Request labor, equipment rental, and subcontractor charges as separate line items.
Ask whether startup and operator instruction are included. A quote should also clarify who handles electrical connections, inspections if required, and final system testing. Scheduling during peak heating season may be harder, especially if the existing system has failed and the work is urgent.
How CleanFire 700 quotes vary across U.S. regions
Dealer coverage, labor costs, freight distance, and local excavation conditions create regional differences. As a rough planning adjustment, rural areas near a participating dealer may be around 5%-10% below a national middle estimate, while high-cost metro areas or remote sites can run 10%-20% above it.
These percentages are budgeting allowances rather than published regional price lists. A dealer may have lower delivery costs but higher excavation charges, or vice versa. State and local rules can also affect placement, emissions requirements, chimney details, or inspection fees. Confirm applicable requirements with the dealer and local building department before comparing final totals.
Compare complete delivered-and-installed quotes from nearby qualified dealers. A furnace price alone does not reveal whether freight, trenching, electrical work, taxes, or startup are included, and these exclusions can outweigh a small equipment discount.
When does removal or an indoor-system upgrade add expense?
Removing an old boiler or furnace can add about $500-$2,000, depending on equipment size, access, and disposal requirements. Replacing indoor pumps, adding a heat exchanger, or correcting outdated piping can add approximately $500-$3,000. These items may not be necessary when the existing system is compatible and in serviceable condition.
Wood fuel is another ongoing budget item. A household may spend $500-$2,500 per year, depending on heating demand, local wood prices, and whether it buys seasoned wood or processes its own. The purchase price of the furnace does not include fuel storage, handling equipment, or the labor of preparing firewood.
Have the installer inspect the existing boiler and piping before approving upgrades. A documented compatibility check can distinguish essential safety or performance work from optional improvements, and help prevent surprise charges after installation begins.
How to lower the CleanFire 700 project total
Keep the trench route as short and direct as the site and manufacturer requirements allow. Before work begins, identify buried utilities, clear equipment access, and settle on the furnace location; avoiding rework can reduce excavation and labor charges. Do not shorten or substitute required pipe or chimney components to save money.
Request at least two itemized quotes with the same scope, including freight, pipe length, excavation, connections, electrical work, startup, and taxes. Compare equipment model and included accessories line by line. A lower bid may exclude work another contractor has included, so evaluate the complete project total rather than the furnace price alone.
Keep optional upgrades separate from required installation work. Ask which controls or accessories are essential for the planned setup, whether removal is included, and what warranty coverage applies. Scheduling before an emergency can provide more time to compare dealer availability and contractor rates.