A First Company air handler typically costs about $900-$3,800 for the equipment, while a complete replacement commonly runs $2,500-$7,000 installed. Price depends on the model and capacity, whether it has electric heat or a hydronic coil, duct and piping compatibility, and local labor rates.

Item Low Average High Notes
First Company air handler only $900 $2,000 $3,800 Unit price varies by model, capacity, and heat configuration
Basic replacement installation $2,500 $4,500 $7,000 Existing connections and ductwork are usable
Air handler with significant modifications $4,000 $6,500 $10,000+ May include electrical, duct, piping, or access work
Typical equipment rate $900 $2,000 $3,800 Per air handler, before installation

First Company air handler prices by replacement scope

For a straightforward residential changeout, budgeting $3,000-$5,500 installed is a reasonable starting point. That estimate generally assumes a standard-size First Company unit, similar replacement connections, ordinary access, and no major duct redesign. The national range is broad because the product line includes different cabinet styles and heating configurations, and contractor pricing is local.

A smaller fan coil or air handler for a condo, apartment, or compact home may cost $900-$1,800 for the equipment and around $2,500-$4,000 installed. Midrange units commonly cost $1,500-$2,800 before labor, with a replacement total of approximately $3,500-$6,000. Larger, less common, or more specialized configurations can bring equipment to $2,500-$3,800 and the installed project to $5,000-$7,000 or more.

These figures cover the air handler or fan coil itself, not necessarily the outdoor heat pump, boiler, or chiller that supplies heating or cooling. If the connected system also needs replacement, the total project can rise substantially. Assumptions: standard residential equipment, typical U.S. contractor labor, and an existing system with compatible ducts, electrical service, and hydronic connections.

First Company equipment is often selected for applications where cabinet dimensions, coil arrangement, or hydronic system compatibility matter. The name alone does not establish the correct price: a quote should identify the exact model, capacity, voltage, coil type, and included controls. Confirm whether the figure covers equipment only or a complete installed replacement.

What the First Company replacement quote includes

Labor and connection work can account for $1,200-$3,000 of a normal replacement. The equipment may be a large share of the bill, but removal, reconnection, testing, and startup are essential parts of a working installation. Ask the contractor to list these items separately so an apparently low quote can be compared fairly.

Quote component Typical range What it may cover Price basis
Air handler materials $900-$3,800 First Company cabinet, fan, coil, and standard components Per unit
Labor $1,000-$2,800 Removal, setting, connection, and startup About $75-$150 per hour
Equipment and supplies $150-$700 Disconnects, drain parts, fittings, insulation, and small materials Per job
Delivery and disposal $100-$500 Freight, handling, and disposal of the old unit Per job
Permits and inspection $0-$500 Local permit, inspection, or filing charges Per job, where required

Replacement labor commonly takes 6-12 hours when the old unit is accessible and compatible. A tight closet, attic installation, difficult vertical lift, or changed pipe and duct connections may extend the work or require an additional technician. Contractors may also include overhead, warranty administration, and a startup check in the quoted total rather than listing them as separate line items.

For labor comparisons, a rough estimate is . For example, 8-12 hours at $90-$140 per hour implies $720-$1,680 in direct labor before any helper time, travel, overhead, or specialty work. A contractor’s billed labor may not match an individual technician’s wage because the rate can include insurance, vehicles, tools, and business expenses.

Check whether the quote includes a new thermostat, condensate safety switch, drain pan, filter rack, or electrical disconnect. Those items may be appropriate depending on the installation, but they are not automatically included in every base replacement price. Assumptions: prices are typical planning ranges, not a manufacturer list price; local taxes and unusual delivery charges may be additional.

Capacity, heat type, and cabinet fit change the price

Correct system matching matters more than choosing the lowest-priced cabinet. Air handlers and fan coils must suit the connected equipment and building load. A unit that does not match the duct system, electrical supply, or hot-water coil can require costly modifications or fail to provide expected comfort.

Capacity is commonly expressed in tons for cooling applications: 1 ton equals 12,000 Btu per hour. Residential systems often fall around 1.5-5 tons, but the replacement should be selected from a load calculation and system specifications, not floor area alone. A higher-capacity unit can cost more and may need larger electrical components or duct changes; moving from a 2-ton to a 4-ton system can also mean replacing compatible components beyond the air handler.

Heating configuration is another major cost driver. A unit with electric resistance heat may need a 5-20 kW heat package, appropriate circuit capacity, and wiring. If the home’s panel or feeder cannot support the required load, electrical work can add roughly $500-$2,500 or more. Hydronic models instead use a water coil connected to a boiler or other hot-water source; piping condition, valve configuration, and coil compatibility affect labor and parts.

Cabinet dimensions can matter as much as capacity in closets and utility rooms. If the replacement does not fit the existing opening, expect carpentry, platform, or access work that can add $300-$1,500. Changes to supply or return duct connections may add $400-$2,000, depending on the number of transitions and whether return-air sizing is inadequate.

Control features and motor type also affect the quote. A variable-speed or electronically commutated motor configuration can cost more than a basic fixed-speed arrangement, although the exact premium depends on model and availability. Verify the blower type, coil arrangement, voltage, and heating package against the existing system before accepting a substitute. Assumptions: capacity examples are common residential ranges; actual model availability and specifications vary by First Company product series.

How many labor hours does an air handler swap take

A clean, like-for-like replacement may take one workday, while a modified installation can span two days. A two-person crew often completes a straightforward changeout in 6-10 clock hours, though some contractors schedule longer to allow for draining, fittings, testing, and cleanup. The work time depends on access and system type, not just the equipment price.

For a closet unit with easy access, existing drain and electrical service, and reusable connections, labor may be near the low end of the range. An attic or crawlspace location, stairs, narrow doors, or the need to protect finished surfaces can add 2-6 labor hours. A hydronic setup may require draining and refilling a circuit, purging air, or adjusting valves; those tasks can add time beyond a basic electrical fan-coil connection.

Ask the contractor to state whether the estimate includes two technicians, travel, startup, and a return visit if a part is unavailable. A low labor allowance can be misleading if commissioning or system balancing is excluded. For replacement work, startup should include checking airflow, fan operation, drainage, heating or cooling response, and control operation.

Scheduling can affect the price as well. Emergency service during a heat wave or cold snap may include an after-hours or rush charge of $150-$500, while planned replacement is usually easier to schedule. A unit that must be special-ordered can also create a wait; confirm whether the quote is based on the exact model in stock or an estimated delivery date.

Removal, electrical upgrades, and other add-on charges

Existing-condition repairs are a common reason a final invoice exceeds the base changeout quote. Removal and disposal may be included, but can be listed separately at $100-$500. A difficult attic removal or equipment that must be dismantled in place may cost more. Confirm whether refrigerant handling is relevant to the specific system and whether it is included; air handlers connected to refrigerant lines require proper recovery and reconnection procedures.

Drainage problems can add $150-$700 for a new condensate line, trap, pan, float switch, or drain correction. Electrical modifications commonly range from $250-$1,500 for a new disconnect, wiring correction, or circuit work. More substantial panel or feeder upgrades can exceed $2,500, especially when an electric heat package adds significant load.

Duct transitions, return-air corrections, or sealing often cost $300-$2,000. If a system is hydronic, deteriorated valves, isolation fittings, or piping repairs may add $200-$1,200. These are not required on every replacement, so the quote should explain the defect, proposed work, and whether the old connections can safely remain.

Permit costs vary by jurisdiction and scope, often ranging from $0-$500 for residential HVAC work. Some locations require an electrical permit or inspection when wiring changes are made. Warranty terms also affect value: ask whether the quoted price includes the manufacturer’s parts warranty registration and what labor warranty the installer provides. Assumptions: add-on ranges represent common repair or modification work and are not a required package for every installation.

Regional labor rates shift installed prices

Local labor and access conditions can move an otherwise similar quote by 10%-30%. Larger metro areas and high-cost coastal markets often price installation above the national middle, while some rural markets have lower hourly labor but higher delivery or travel charges. The exact difference depends on contractor availability and the work involved.

As a planning comparison, a basic replacement that might be quoted at $3,500-$5,500 in a moderate-cost market could reach $4,200-$7,000 in a high-cost metro. A comparable job in a lower-cost market might land around $2,800-$4,800, although limited local supply or a long service drive can erase part of the savings. These are directional comparisons, not guaranteed regional price lists.

Climate and system design matter too. In colder regions, homes may have larger electric heat packages or hydronic equipment, potentially increasing electrical or piping scope. In humid climates, condensate management and drainage details can be especially important. Contractor quotes should be compared within the same local market and with the same model, scope, and warranty assumptions.

Freight can be notable if a specific cabinet or coil is not stocked nearby. A special-order unit may add $100-$600 in delivery or handling, while a substitute model might require additional adaptation. Ask whether the quote includes freight and whether substitutions are equivalent in dimensions, capacity, voltage, coil, and controls.

Repairing a First Company unit versus replacing it

Repair is often the less expensive choice when the cabinet and coil are sound and the fault is isolated. Common service calls may cost $125-$250 for diagnosis, with repairs such as a capacitor, relay, control, or motor ranging from roughly $200-$1,200 including labor. A motor or control replacement near the lower part of that range can make sense on a newer, well-maintained unit.

Coil leaks, extensive corrosion, repeated electrical failures, or parts that are difficult to source can make replacement more practical. A coil or major assembly repair may run $800-$2,500, depending on access and system type. Compare that estimate with the installed replacement price, and include the age of the equipment, parts availability, warranty status, and the condition of the connected heat pump, boiler, or chiller.

Replacing only the air handler may be appropriate when the connected equipment is compatible and in good condition. However, system matching can limit choices: a new air handler should be checked against the outdoor unit or hydronic source for capacity, controls, and coil specifications. Replacing a mismatched component can reduce performance or create warranty complications.

For a unit that is roughly 10-15 years old, repeated repairs totaling $1,500-$2,500 deserve comparison with a replacement quote, but age alone is not a rule. A newer unit with a small, reliable repair may be worth keeping; an older unit with a failed coil and poor parts availability may not. Request both a repair diagnosis and a clearly scoped replacement estimate when the decision is uncertain.

Lower the replacement quote without sacrificing system fit

The most reliable savings come from controlling scope and comparing equivalent bids. Provide contractors with the current model and serial number, cabinet measurements, heat type, and photos of connections. This helps identify a true replacement match and reduces the chance that a low initial quote omits required electrical, drain, piping, or duct work.

Get at least three written quotes that name the exact First Company model or explain any proposed substitute. Compare equipment, labor, removal, accessories, permit charges, startup, and warranty line by line. A bid $800 lower may exclude a thermostat, condensate protection, freight, or disposal; a higher bid may include necessary work that the others omitted.

Keep the project focused if the ducts, electrical supply, and hydronic piping are in acceptable condition. Ask the contractor to document why any proposed upgrade is needed and whether it is required by code, manufacturer instructions, or a verified system problem. Avoid paying for a larger capacity or upgraded motor without confirming the design need and compatibility.

Scheduling a non-emergency replacement during a slower period may improve appointment availability and reduce rush charges, though seasonal discounts are not guaranteed. If the old unit still operates safely, planning ahead can also allow time to compare model availability and delivery. Do not postpone a repair involving electrical hazards, water leakage, or loss of heat in unsafe conditions.

Before work begins, confirm the full installed price, deposit, change-order process, permit responsibility, disposal, and labor warranty in writing. Assumptions: savings depend on local bids and equipment availability; proper sizing, safe electrical work, and compatible system connections should not be traded away to reduce the price.