A.B. Martin metal roofing prices depend on panel style, steel thickness, finish, roof size, and whether the quote includes installation. For a typical 2,000-square-foot roof, materials may run about $4,000-$10,000, while a professionally installed system commonly totals $10,000-$22,000 before major repairs or premium details.
The figures below are planning ranges, not a current A.B. Martin quote; delivered prices vary by product, location, order size, and contractor.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| Metal roofing materials | $2-$3 per sq. ft. | $3-$5 per sq. ft. | $5-$8 per sq. ft. | Panel, trim, fasteners, and finish affect the rate |
| Installed metal roof | $5-$7 per sq. ft. | $8-$11 per sq. ft. | $12-$18 per sq. ft. | Assumes standard access and no extensive deck repair |
| 2,000-sq.-ft. roof, installed | $10,000 | $16,000 | $36,000 | High end reflects premium materials or complex scope |
| Old roof removal | $1-$2 per sq. ft. | $2-$3 per sq. ft. | $4-$6 per sq. ft. | More for multiple layers or difficult disposal |
What A.B. Martin metal roofing costs by roof size
A.B. Martin sells metal roofing products, but the price paid depends on the specific panel and accessories ordered. As a practical budget, basic exposed-fastener steel panels may cost about $2-$4 per square foot for materials, while concealed-fastener or upgraded-finish systems often fall around $4-$8 per square foot. These estimates generally exclude freight, tear-off, and installation.
For a straightforward roof, plan on roughly $8-$11 per square foot installed, or $16,000-$22,000 for 2,000 square feet. A basic installation over a prepared roof can fall below that range; steep pitches, premium finishes, and structural work can push the total above it. The roof’s measured surface area—not the home’s floor area—determines the material quantity.
For planning, a 1,500-square-foot roof might cost $3,000-$12,000 for panels and related materials, or approximately $7,500-$27,000 installed. A 2,500-square-foot roof could run $5,000-$20,000 for materials and about $12,500-$45,000 installed. The broad upper range accounts for difficult geometry and higher-cost systems, not just product price.
Assumptions: U.S. pricing, ordinary residential access, standard steel products, and typical contractor labor; freight, taxes, and major structural repairs may be additional.
How panels, trim, labor, and delivery shape the quote
A complete estimate separates the roofing panels from the work and the smaller items that finish the roof. Comparing quotes is easier when each contractor identifies panel profile, gauge, finish, underlayment, trim, fasteners, removal, and freight rather than listing one unexplained total.
| Quote component | Typical price | What changes the charge | Typical 2,000-sq.-ft. amount |
|---|---|---|---|
| Panels and finish | $2-$8 per sq. ft. | Profile, steel thickness, coating, and color | $4,000-$16,000 |
| Trim, closures, and fasteners | $0.50-$2 per sq. ft. | Ridges, valleys, eaves, edges, and penetrations | $1,000-$4,000 |
| Underlayment and accessories | $0.30-$1.25 per sq. ft. | Membrane type and cold-weather protection | $600-$2,500 |
| Installation labor | $3-$8 per sq. ft. | Pitch, access, tear-off, and crew rates | $6,000-$16,000 |
| Freight and disposal | $300-$2,000 per job | Delivery distance, order size, and old roofing | $300-$2,000 |
These amounts are cost components, not fixed add-ons to every project. Labor may include installation of flashing and trim, while a supplier quote may include only materials. Ask whether the estimate is materials-only or turnkey, and confirm freight and tax are included or itemized.
Which roof pitch, panel gauge, and layout raise prices
Roof area and pitch are important: a 2,000-square-foot home footprint can require 2,200-2,600 square feet of roofing on a pitched roof, depending on design and overhangs. Contractors may charge more for roofs above a 6:12 pitch because workers need additional fall protection and move more slowly. A steep roof can add roughly 10%-25% to labor compared with an easy, walkable roof.
Panel style and thickness also change material cost. Exposed-fastener panels are generally less expensive to buy and install than standing-seam panels, which use concealed clips and require more precise fitting. Moving from a basic panel to a thicker or higher-specification product can add about $0.50-$2.50 per square foot, depending on the exact product and finish.
Complex roof geometry creates more cutting and trim. Dormers, hips, valleys, skylights, and multiple chimneys can add $500-$3,000 or more in labor and accessories on a residential project. In regions with heavy snow, high winds, or coastal exposure, local fastening requirements and specified underlayment may increase the material bill.
Check the exact panel profile and gauge on the quote rather than comparing only the price per square foot. “Metal roofing” covers products with different performance specifications and installation details, so two low bids may not include equivalent materials.
Where A.B. Martin roofing quotes vary across the U.S.
Delivery location can meaningfully affect the price of products purchased from a regional supplier. Buyers near a distribution point may pay less for freight than customers farther away; a long-distance delivery or a small order can add several hundred dollars or more. Confirm the delivery zone, unloading requirements, and whether the quote assumes a full truckload.
Installed prices also vary with local labor markets. In high-cost metropolitan areas and parts of the Northeast or West Coast, labor and contractor overhead may be 10%-25% above a national midpoint. Rural areas can have lower labor rates, but a longer trip or limited installer availability may offset the savings. Weather exposure and local code requirements can change the specified assembly as well.
Use a local installed quote to budget the project, and treat a supplier’s panel price as only one part of the total. A product price from another state may not include delivery, local trim requirements, or the labor rate where the roof will be installed.
How long metal roof installation takes and what labor covers
A typical residential replacement may take a crew of three or four about 2-5 working days, depending on roof size, tear-off, weather, and detailing. A simple roof with easy access can take less time; a steep roof with multiple valleys and penetrations can require a week or longer. Delivery timing and weather can also delay the start.
Roofing labor commonly prices at about $3-$8 per square foot, but some contractors estimate by crew hours or a project total. A rough labor calculation is shown below; actual bids account for setup, safety equipment, travel, and business overhead as well as time on the roof.
Example: 48 crew-hours at an effective $75-$125 per hour equals $3,600-$6,000 in labor before separate removal or repair charges.
Confirm whether the labor line includes underlayment, flashing, cleanup, and installation of all trim. A low labor number may exclude tasks that another contractor includes, creating a misleading comparison.
Three realistic A.B. Martin metal roof budget examples
The following examples show how scope changes the installed total. They use estimated delivered material costs and labor ranges; they are not quotes from A.B. Martin or any specific installer.
| Project | Material basis | Labor and other work | Estimated total |
|---|---|---|---|
| Small, simple 1,200-sq.-ft. roof | Basic panels and trim at $3-$5 per sq. ft., or $3,600-$6,000 | Installation and modest delivery, $3,600-$7,200 | $7,200-$13,200 |
| Typical 2,000-sq.-ft. replacement | Midrange panels and accessories at $4-$6 per sq. ft., or $8,000-$12,000 | Labor, tear-off, and disposal, $7,000-$13,000 | $15,000-$25,000 |
| Complex 2,500-sq.-ft. roof | Premium system and detailed trim at $5-$8 per sq. ft., or $12,500-$20,000 | Steep-roof labor, removal, and delivery, $12,000-$22,000 | $24,500-$42,000 |
The simple-roof example assumes limited penetrations and normal access. The complex example allows for a steeper roof, more flashing, and slower installation. Use the scope and unit rates—not the total alone—to compare a contractor’s proposal with another bid.
Removal, deck repairs, and delivery charges to check
Removing asphalt shingles usually adds about $1-$3 per square foot, with higher charges possible for several layers, heavy materials, or difficult access. Disposal may be included in a tear-off rate or shown separately. A roofing quote should state whether the crew will remove existing shingles, haul away debris, and protect landscaping.
Once old roofing is removed, damaged decking may need replacement. Plywood or roof sheathing replacement can cost roughly $3-$8 per square foot of repaired area, including material and labor, though local rates and access vary. Contractors may use a per-sheet charge, commonly around $75-$150 per sheet installed, and should get approval before expanding repairs.
Delivery is another item to verify when ordering panels. Long panels need appropriate transport and unloading, and a small order may not qualify for the best delivery rate. Ask for a written allowance for concealed deck damage and a clear change-order rate before work begins.
Ways to lower the installed price without cutting roof life
Keep the roof design and scope straightforward where practical. Combining separate small roof areas into one scheduled job can reduce repeated delivery, setup, and minimum labor charges. If an existing roof is suitable for an approved overlay, compare that option with tear-off; overlays are not allowed or appropriate in every condition and may complicate future repairs.
Choose a panel specification based on the home’s exposure and local requirements rather than upgrading every feature by default. Compare standard colors and finishes, but do not substitute a product that fails wind, fire, or code requirements. Ask whether underlayment and trim are matched to the panel system and roof details, not simply omitted to hit a lower bid.
Collect at least three itemized quotes using the same roof measurements and product specifications. Schedule outside peak demand when possible, and complete accessible prep such as clearing the driveway or moving patio items. Preserve required flashing, fastening, and weather protection; cutting those items can create repair costs that outweigh the initial savings.