Bulthaup B3 Price List and U.S. Kitchen Costs 2026

A Bulthaup B3 price list is generally prepared as a project-specific dealer quote, not a fixed national catalog: layout, finishes, storage, appliances, and installation all affect the total. In the United States, a modest B3 kitchen may start around $50,000, while a larger, fully equipped project can exceed $200,000.

For a typical mid-size kitchen, budgeting about $90,000-$150,000 for cabinetry, design, delivery, and installation is a practical starting point. The ranges below are planning estimates, not official Bulthaup list prices; local dealers determine actual specifications and pricing.

Item Low Average High Notes
B3 cabinetry and storage $35,000 $75,000 $150,000+ Depends on layout, finish, and internal fittings
Design, delivery, and installation $8,000 $20,000 $40,000+ Site access and project scope affect charges
Countertops $4,000 $10,000 $25,000+ Material, thickness, and fabrication matter
Appliances and fixtures $8,000 $20,000 $45,000+ Brand and package selection vary
Complete kitchen project $55,000 $120,000 $250,000+ May exclude structural work and major utilities

What a Bulthaup B3 kitchen costs at typical sizes

For a compact kitchen with roughly 10-14 linear feet of cabinetry, a straightforward layout, and restrained finish choices, cabinetry may run about $35,000-$60,000. A more common 18-25 linear-foot kitchen with an island, a mix of drawers and tall units, and upgraded finishes can place cabinetry around $60,000-$110,000.

Large open-plan kitchens, extensive wall storage, custom panels, and multiple islands can push cabinet pricing to $120,000-$150,000 or more before appliances, stone, plumbing, or construction. Cabinet prices do not translate neatly into a single per-foot rate: a tall cabinet wall or drawer-heavy run typically costs more than the same length of basic base cabinets.

Use $2,500-$6,000 per linear foot as a rough cabinet-planning range, not a dealer quote. This broad estimate reflects premium custom configurations; a project with tall units, specialized finishes, or extensive accessories can exceed it. Assumptions: U.S. dealer pricing, standard residential access, premium cabinetry, and no major structural changes.

How B3 cabinets, installation, and finishes shape the quote

A proposal may bundle design, cabinetry, delivery, and installation, so buyers should ask for itemized amounts and clarify which trades are included. The table gives practical estimating ranges for a typical project; line items vary by dealer and location.

Quote component Typical price range Common pricing basis What changes it
Cabinet boxes, fronts, and hardware $35,000-$150,000+ $2,500-$6,000 per linear ft, approximate Run length, tall units, finish, and drawer count
Design and project coordination $2,000-$10,000 Flat fee or included service Revisions, drawings, and project complexity
Installation labor $6,000-$20,000 $75-$150 per labor hour Cabinet count, site conditions, and adjustments
Delivery and handling $1,000-$5,000 Per shipment or project Distance, stairs, lift access, and storage
Countertop supply and fabrication $4,000-$25,000+ $75-$250+ per sq ft installed Stone type, cutouts, seams, and edge detail
Removal and disposal $1,000-$5,000 Per kitchen Existing cabinet volume and disposal access

Labor rates shown are planning figures for skilled kitchen installation, not a published Bulthaup rate. Cabinet installers may charge by the project rather than by the hour, and some dealers include installation in a combined price.

Confirm whether the quote includes site measurement, delivery, installation, countertop coordination, and final adjustments. Electrical, plumbing, flooring, painting, and general contracting are often separate, even when the kitchen dealer coordinates the schedule.

Why cabinet length, island size, and finishes move B3 pricing

Cabinet quantity is a major cost driver, but the configuration matters as much as the length. An 8-foot run of tall storage can cost substantially more than 8 feet of simple base units because it uses more material and may include interior fittings, integrated appliances, or custom panels.

Island size is another measurable variable. A compact 6-by-3-foot island with basic storage is less expensive than an 8-by-4-foot island with deep drawers, seating overhang, finished sides, and a stone waterfall. Added cabinetry and countertop area can increase the island portion by several thousand dollars; complex stone fabrication can add more.

Front material and finish affect both the cabinet price and the appearance of the finished room. Wood veneer, lacquer, metal, glass, or specialty surfaces can have different price points and lead times. A project using one consistent finish is generally simpler to price than one mixing several materials or requiring unusual panel dimensions.

Specify cabinet length, tall-unit count, island dimensions, and finish selections before comparing quotes. Also list drawer organizers, pullouts, lighting, appliance panels, and waste-sorting units; each can change the specification and the total.

Where a B3 budget can be trimmed without losing function

Keep the cabinet plan focused on storage needs rather than filling every wall. Reducing a run by 4-6 linear feet, omitting a secondary tall cabinet, or simplifying a large island may lower the cabinet package by several thousand dollars, depending on the units removed and finishes involved.

Use premium finishes selectively. A restrained combination of one feature material and more standard surfaces elsewhere can cost less than applying a specialty finish across every front. Likewise, standard cabinet widths and fewer custom panels can reduce design and fabrication complexity.

Compare the full scope of at least two dealer proposals. Check cabinet counts, finish codes, interior fittings, delivery, installation, taxes, and exclusions rather than comparing only the headline total. If the quotes differ, ask the dealer to price the same layout and specification before deciding what the price gap means.

Keep the layout and cabinet schedule stable while comparing bids. Late changes to appliance dimensions, plumbing locations, or island size may require revised drawings, replacement parts, or extra trade work.

How installation labor and remodeling work add to the total

A relatively direct installation of a prepared kitchen may take about 3-7 working days for a small crew after the room is ready. A larger kitchen with an island, tall cabinet banks, detailed panels, or site adjustments may require 1-3 weeks of installation work. These are on-site estimates; ordering, fabrication, and scheduling can extend the overall project timeline by weeks or months.

Some installer estimates use hourly rates around $75-$150 per worker, while others provide a fixed labor price. A crew of two working 60-100 combined hours at $75-$125 per hour would imply roughly $4,500-$12,500 in labor, before travel, supervision, or specialized adjustments. This arithmetic is a comparison tool, not a promised installation charge.

Remodeling outside the cabinet package can be significant. Moving a sink or range may require new plumbing or electrical work; leveling a floor, opening a wall, or upgrading circuits can add thousands of dollars. Obtain separate estimates from licensed trades and confirm who is responsible for measurements and appliance clearances.

A cabinet quote is not necessarily a complete renovation quote. Ask for a written list of included work and exclusions, especially demolition, disposal, wall repair, flooring, electrical, plumbing, and final countertop installation.

How New York, California, and smaller markets compare

Labor and project costs can differ by roughly 10%-25% between lower-cost markets and expensive coastal metros. New York City, San Francisco, Los Angeles, and other high-cost urban areas may land above a national planning estimate because of labor rates, delivery logistics, building access, and contractor coordination.

Suburban projects with straightforward truck access may avoid some urban handling charges, while rural addresses can face longer delivery routes or fewer installers familiar with the product. A remote site may incur a travel or delivery premium even when local labor is less expensive. For a $100,000 kitchen package, a 10%-20% market difference would represent about $10,000-$20,000, but not every line item changes by the same percentage.

Request a local, delivered-and-installed quote rather than applying a flat regional multiplier to the cabinet price. Ask whether the estimate includes stairs, elevator reservations, parking, storage, and any building-specific work-hour restrictions.

What three B3 project budgets can look like

These examples illustrate how scope changes the total. They are estimates for comparison, not official packages or a guarantee of dealer pricing. Construction work and taxes may be additional.

Project scenario Cabinet specification Other included items Estimated total
Compact city kitchen 12 linear ft, limited tall storage, standard finish Basic delivery and installation; modest countertop allowance $55,000-$85,000
Mid-size remodel 21 linear ft, 7-by-3.5-ft island, mixed storage Installation, delivery, midrange stone, selected appliances $105,000-$165,000
Large custom kitchen 30+ linear ft, large island, premium finish and fittings Detailed installation, high-end stone, premium appliances $190,000-$300,000+

The compact example assumes the existing room needs limited trade work. The mid-size budget allows for a functional island and a more complete appliance package, while the large project assumes extensive cabinetry and premium selections. Appliance choices, wall changes, and local installation costs can move any example outside its range.

Use the scenario closest to the room, then replace each allowance with written local quotes. A detailed cabinet schedule and appliance list make that comparison more reliable than a broad budget number.

What to verify before accepting a Bulthaup B3 estimate

Check that the proposal identifies the cabinet model, dimensions, finish, hardware, interior accessories, and quantity of each unit. Confirm whether the listed amount is for cabinetry only or includes design, delivery, installation, and project management. Request an expiration date and ask how price changes are handled if the specification changes.

Countertops and appliances deserve separate review. Confirm the stone or surface allowance, measured square footage, sink and cooktop cutouts, edge profile, and who pays for templating. For appliances, match exact model numbers and verify panels, ventilation, electrical requirements, and installation responsibility.

Also ask whether sales tax, removal, storage, permits, and building access charges are included. Permit requirements depend on local work and may apply when plumbing, electrical, or structural elements change; cabinetry replacement alone may be treated differently by local authorities.

A useful price list is an itemized, dated specification with clear inclusions and exclusions. Without those details, two apparently similar totals may describe very different kitchens.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top