Clean Burn CB-1750 Price and Installation Costs 2026

A new Clean Burn CB-1750 waste-oil furnace typically costs about $6,500-$9,500 for the equipment, while a complete installed system often runs $10,000-$17,000. The final price depends on the dealer, included tank and controls, venting, electrical work, delivery distance, and whether the shop needs upgrades before installation.

Item Low Average High Notes
CB-1750 furnace equipment $6,500 $8,000 $9,500 Furnace and burner; package contents vary
Installed system $10,000 $13,500 $17,000 Typical shop installation with standard access
Used furnace $2,500 $4,500 $6,500 Condition, age, and service history matter
Annual service $250 $450 $750 Cleaning and inspection; parts may cost extra

What a CB-1750 furnace costs for a typical shop

Retail quotes for the CB-1750 commonly fall around $6,500-$9,500 before installation. A midrange budget of roughly $8,000 is reasonable for the furnace and burner when the quote does not include a storage tank, chimney, delivery, or extensive accessories. Dealer pricing and package contents differ, so the equipment line should be checked rather than compared by model name alone.

A complete operating system generally totals $10,000-$17,000. That range assumes a suitable commercial garage or workshop, normal access, standard venting, and no major electrical or building alterations. A difficult roof penetration, long flue route, remote delivery, or code-related upgrades can push the project above that range.

For initial budgeting, allow about $13,500 for a professionally installed CB-1750 system. This is an estimate, not a manufacturer-set price; the local dealer’s written scope determines what is included.

Assumptions: U.S. pricing in USD, typical small-shop installation, standard equipment package, and no major structural work.

Which burner, tank, vent, and labor charges shape the quote

Equipment is only part of the invoice. A quote may bundle the furnace, waste-oil storage, delivery, venting, setup, and startup, or list each separately. Ask whether the burner accessories and required oil-handling parts are included; a low equipment price can become less competitive when those items are added.

Quote item Typical price What changes the charge Check before accepting
Furnace and burner $6,500-$9,500 Dealer package and included controls Confirm exact model and included parts
Waste-oil tank and piping $700-$2,000 Tank capacity, construction, and piping length Confirm tank is suitable for the intended oil
Flue, chimney, and roof work $500-$2,000 Flue length, diameter, route, and roof access Request materials and penetration details
Installation labor $1,500-$3,500 Crew size, site preparation, and hookup complexity Separate installation from startup and service
Delivery and disposal $150-$800 Distance, unloading needs, and old equipment removal Ask whether freight and disposal are included
Permits and electrical work $200-$1,200 Local rules and existing circuit capacity Identify inspections and code upgrades

These are planning ranges, not guaranteed line-item prices. Installation may be quoted as a fixed package, and an existing suitable chimney or tank can reduce the amount of new work. Conversely, a site requiring new electrical service or substantial flue changes may exceed the figures shown.

Compare the complete scope and installed total, not just the furnace price.

How BTU output, shop size, and oil storage affect price

The CB-1750 model is associated with a nominal 175,000 BTU-per-hour heating output. Matching that output to the building matters: insulation, ceiling height, door openings, winter temperatures, and operating hours all influence heat demand. A contractor should assess the space rather than assume that a particular square-foot figure guarantees adequate heating.

Storage capacity and location also affect the quote. A basic tank and short connection may cost $700-$1,200, while a larger tank, containment requirements, longer piping, or difficult placement can bring that portion to $1,500-$2,000 or more. A run of roughly 25-50 feet can require more pipe and labor than a tank placed beside the furnace.

Venting is another measurable variable. A short, straightforward flue route can be near the lower end of the venting allowance; a route with multiple bends, a long rise, or a roof opening may add several hundred dollars to more than $1,000. The installer should verify the required flue configuration and clearances for the specific installation.

Capacity, tank placement, and flue length are more useful price predictors than building area alone. A shop with high heat loss or frequent open-door traffic may need a different heating plan, so the equipment selection should be confirmed before purchase.

How many installation hours and crew visits to expect

A straightforward installation often takes a two-person crew about 8-16 hours, usually completed in one workday or split between installation and startup. At labor rates of $75-$125 per hour, that represents roughly $1,200-$4,000 in labor before any separate electrical, roofing, or inspection charges. Fixed-price dealer packages may not show the hourly calculation.

Time increases when the installer must build a new flue route, reposition a tank, add a circuit, remove old equipment, or correct access and clearance problems. A second visit may be needed for commissioning or inspection. Clarify whether startup, burner adjustment, and a return visit are included in the installation fee.

Ask for the expected crew size, number of visits, and labor inclusions in writing. The same total can represent very different scopes if one quote includes startup and another charges for it separately.

Why installed CB-1750 prices vary between U.S. regions

Dealer availability and labor rates can shift installed pricing by region. In areas with several waste-oil heating dealers and common shop installations, a standard project may land near the national planning range. A comparable job in a remote location, a high-cost metro area, or a region with limited technicians may cost about 10%-25% more because of travel, freight, and labor.

Rural customers may see lower hourly labor rates but higher delivery or service-call charges. Urban sites can face higher contractor rates, restricted delivery access, and additional permitting requirements. Harsh winter climates can also affect scheduling: installers may be busier before heating season, although local demand and weather determine the size of any premium.

Compare at least two local, scope-matched quotes rather than applying one national average to every market. Include freight, taxes, permit charges, and service availability when comparing dealer offers.

What used CB-1750 units and replacement parts may cost

A used CB-1750 may sell for approximately $2,500-$6,500, excluding transport and reinstallation. A clean, recently serviced unit with documented operating history generally commands more than a furnace of unknown age or condition. Moving and reinstalling a used system can add $1,500-$4,000, so a low purchase price does not necessarily mean a low finished cost.

Before buying used, budget for inspection, cleaning, burner testing, and possible replacement parts. A service visit may cost $250-$750, while a repair can add several hundred dollars or more depending on the failed component. Parts availability and the condition of the burner, controls, heat exchanger, and oil delivery system should be checked by a qualified technician.

For comparison, a new furnace with a dealer-backed package costs more upfront but may provide clearer warranty coverage and support. A repair to an existing CB-1750 may be economical when the heat exchanger and core controls are sound; repeated major repairs or a severely deteriorated unit can make replacement more practical.

Price a used unit as a complete project, including inspection, transport, repair, and installation. Confirm the model identification and service records before paying a deposit.

Three realistic CB-1750 quotes for different shop setups

The examples below show how the same furnace can produce different totals. They are illustrative estimates, not dealer offers. Taxes are excluded, and each assumes a qualified installer verifies the site and equipment requirements.

Scenario Equipment and accessories Labor and site work Estimated total
Prepared shop with usable flue $7,500-$8,500 $1,500-$2,500 $9,000-$11,000
Typical shop, new tank and vent work $8,000-$10,000 $3,000-$4,500 $11,000-$14,500
Remote or complex installation $8,500-$10,500 $5,000-$7,000 $13,500-$17,500

In the first example, the building already has a suitable vent route and minimal site work. The second includes a new storage arrangement and ordinary vent modifications. The third allows for long-distance delivery, roof or flue complications, and additional electrical or inspection work.

The written quote should identify which scenario it resembles and list excluded work. If labor hours are not shown, request a description of crew time and any potential extra charges.

Which CB-1750 upgrades can be deferred to lower the bill

Keep the project limited to components required for safe, code-compliant operation. Optional monitoring or convenience accessories may be candidates for a later purchase, but required burner controls, oil-handling parts, venting, and clearances should not be omitted to reach a target price. Ask the dealer to distinguish required equipment from optional additions.

Prepare the site before the crew arrives by clearing the furnace and tank locations, confirming delivery access, and resolving basic access issues. This can reduce paid labor time if the contractor agrees that the preparation is appropriate. Do not modify fuel lines, electrical connections, or venting without qualified guidance.

Request itemized bids from at least two dealers using the same model and installation scope. Compare delivery, startup, warranty terms, permit handling, and service-call rates. A lower quote may exclude the tank or startup, while a higher quote may include more complete commissioning.

The most reliable savings come from controlling scope and avoiding duplicate or unnecessary upgrades, not removing required safety work. If an existing tank, circuit, or flue may be reusable, ask a qualified installer to inspect it before budgeting for replacement.

Questions that change a dealer’s CB-1750 price

Does the quoted amount include freight, unloading, the storage tank, piping, venting, startup, and permits? Is the price for the furnace alone or a complete operating system? These questions reveal common exclusions that can add hundreds or thousands of dollars after the initial quote.

Ask what warranty applies to the furnace and burner, who performs service, and whether labor is covered. Confirm whether the dealer has included sales tax and whether inspection fees are billed separately. For a used unit, ask for maintenance records, a condition report, and a written estimate for any recommended repairs.

A useful quote names the CB-1750, lists included components, states the installation assumptions, and gives a complete out-the-door estimate. If the seller cannot verify compatibility with the site, make the final purchase contingent on an installer’s review.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top