Timberlake cabinet prices vary by collection, finish, kitchen size, and the dealer or builder setting the quote; the brand does not publish one universal retail price list. A typical 10-by-10-foot kitchen may cost about $5,000-$14,000 for cabinets alone, or $8,000-$25,000 installed, before countertops and appliances.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| Cabinets for a 10-by-10 kitchen | $5,000 | $9,000 | $14,000 | Cabinet order only; excludes installation |
| Installed 10-by-10 kitchen | $8,000 | $15,000 | $25,000 | Typical cabinets and standard installation |
| Cabinet price per linear foot | $150 | $300 | $500 | Approximate cabinet-only comparison |
| Installation labor | $1,500 | $3,500 | $7,000 | Depends on layout and removal needs |
Timberlake kitchen cabinet prices by project size
For a small kitchen with roughly 15-20 linear feet of cabinetry, cabinet-only pricing commonly falls around $5,000-$9,000. A mid-size kitchen with 25-30 linear feet is often $8,000-$15,000, while a larger layout with an island, tall pantry cabinets, and upgraded finishes can reach $14,000-$25,000 or more.
Installed totals assume stock or semi-custom configurations, standard access, and no major plumbing or electrical changes. Costs shift with region and dealer discounts, so the most useful comparison is a written quote based on the same cabinet list and finish. Assumptions: U.S. market, standard kitchen layout, midgrade doors, and ordinary installation access.
What cabinet boxes, doors, and labor add to a quote
A Timberlake estimate may combine cabinetry, delivery, installation, and project-specific charges. Ask the dealer to separate these items and identify whether trim, fillers, panels, and hardware are included.
| Quote component | Typical range | Pricing basis | What changes it |
|---|---|---|---|
| Cabinet boxes and doors | $5,000-$14,000 | $150-$500 per linear ft | Quantity, collection, finish, and door style |
| Installation labor | $1,500-$7,000 | $75-$125 per hour | Cabinet count, leveling, and layout complexity |
| Delivery | $150-$600 | Per order | Distance, shipment size, and handling |
| Removal and disposal | $400-$1,500 | Per kitchen | Old cabinet type and disposal access |
| Trim, panels, and hardware | $300-$2,000 | Per project | Finished ends, crown molding, and pull selection |
Labor is a major separate expense, not automatically included in the cabinet price. A simple installation may take a two-person crew 2-4 days; extensive scribing, uneven walls, or island work can add time.
How cabinet size, finish, and door style change pricing
Cabinet quantity is the clearest price driver: moving from 20 to 30 linear feet can add several thousand dollars before labor. A basic painted or stained door generally costs less than a premium finish, specialty glazing, or intricate door profile. More drawers, roll-outs, and custom organizers also raise the order total.
Layout details can matter as much as the selected collection. A 36-inch-wide pantry cabinet, a bank of deep drawers, or a finished island end typically costs more than a standard base cabinet. Moving plumbing or electrical lines, correcting out-of-square walls, or adding ceiling-height cabinets can increase labor and related trade charges.
Ways to lower a Timberlake cabinet quote without cutting function
Keep cabinet dimensions close to standard widths and reduce unnecessary specialty units. Compare a simpler door and finish against the preferred upgrade, and price organizers individually rather than accepting a large accessory package by default. Using open shelving in a limited area may also avoid a few upper cabinets.
Compare itemized quotes with identical cabinet counts, finishes, delivery, and installation scope. Confirm whether taxes, fillers, toe kicks, crown molding, and finished panels are included. If existing cabinet boxes are sound, ask whether replacing doors or hardware is feasible before budgeting for a full cabinet replacement.
Three realistic Timberlake kitchen quote examples
A compact 10-by-10 kitchen with 18 linear feet of standard cabinets might have a $5,500 cabinet order, $1,800 installation, and $400 delivery, totaling about $7,700 before demolition or counters. A 25-linear-foot kitchen with a midrange finish could be $9,500 for cabinets, $3,200 for installation, and $800 for trim and delivery, totaling about $13,500.
A larger kitchen with an island and premium details can exceed $20,000 installed. For example, 32 linear feet of cabinets at $14,500, 45 labor hours at $100 per hour, and $1,600 in delivery, panels, and trim produces an estimated $20,600 total. Actual dealer pricing and local labor rates can vary substantially.
Installation time and regional labor rates to budget for
Installers commonly charge about $75-$125 per hour, or quote a fixed project price. A straightforward kitchen may require 24-40 crew hours; an island, tall pantry units, or substantial leveling can push labor beyond 50 hours. Confirm whether the installer also handles removal, appliance reconnection, and finish carpentry.
Labor and delivery can run 10%-25% higher in expensive metro markets than in lower-cost areas. Rural locations may have fewer cabinet installers and longer delivery distances, which can also raise the quote. Request local estimates rather than treating a national average as a guaranteed price.
Removal, accessories, and other charges beyond the cabinet order
Old-cabinet removal often adds $400-$1,500, while disposal fees can be higher if the job includes heavy built-ins or difficult access. New pulls may cost $3-$20 each, and roll-out trays or drawer organizers can add roughly $50-$300 per cabinet. Countertops, backsplash, flooring, and appliance work are usually separate trades.
Check the quote for exclusions before comparing the final totals. Ask whether delivery is inside the home, whether damaged parts are replaced without extra freight, and whether the installer charges for a return visit. Permits are uncommon for cabinet-only replacement but may apply when the project changes electrical, plumbing, or structural features.